EVALUASI PENJADWALAN PROYEK DENGAN MENGGUNAKAN METODE CPM (CRITICAL PATH METHOD) DAN ANALISIS KURVA āSā PADA PROYEK PENGEMBANGAN GEDUNG SEKOLAH SMP BARUNAWATI SURABAYA OLEH PT. BRAJA MUSTI SURABAYA
Main Author: | WAHYU , SETIAWAN |
---|---|
Format: | Thesis NonPeerReviewed application/pdf |
Terbitan: |
, 2011
|
Subjects: | |
Online Access: |
http://eprints.upnjatim.ac.id/2145/1/file1.pdf http://eprints.upnjatim.ac.id/2145/2/file2.pdf http://www.upnjatim.ac.id http://eprints.upnjatim.ac.id/2145/ |
Internet
http://eprints.upnjatim.ac.id/2145/1/file1.pdfhttp://eprints.upnjatim.ac.id/2145/2/file2.pdf
http://www.upnjatim.ac.id
http://eprints.upnjatim.ac.id/2145/
Lokasi
Koleksi | Digital Repository UPN Veteran Jatim |
---|---|
Gedung | Perpustakaan UPN Veteran Jawa Timur |
Institusi | UPN Veteran Jawa Timur |
Kota | KOTA SURABAYA |
Provinsi | JAWA TIMUR |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |