MODEL FAKTOR-FAKTOR BERPENGARUH TERHADAP KINERJA MANAJER PROYEK KONSTRUKSI

Main Author: SAHADI, Sahadi
Format: Thesis NonPeerReviewed application/msword
Terbitan: , 2010
Subjects:
Online Access: http://eprints.undip.ac.id/38068/1/Bab_I_SAHADI.doc
http://eprints.undip.ac.id/38068/2/BAB_II_BARU.doc
http://eprints.undip.ac.id/38068/3/BAB_III_BARU_revisi.doc
http://eprints.undip.ac.id/38068/
ctrlnum 38068
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title>MODEL FAKTOR-FAKTOR BERPENGARUH TERHADAP KINERJA MANAJER PROYEK KONSTRUKSI </title><creator>SAHADI, Sahadi</creator><subject>TH Building construction</subject><description>There are various resources that must be managed by a contractor, they include financial, material, equipment, human, and work method resources. These resources are minimum requirements for the completion of a project. In all construction activities, human resource plays the most important role because it controls the use of all other resources. Therefore, human resource will be analyzed in the present study. &#xD; This study aims to develop a model and analyze the influence of leadership, organization climate, organization culture, communication climate, trust, work motivation, work experience, reward, and work satisfaction on the commitment and performance; and then analyze the influence of commitment on the performance of construction project managers. Next, based on the results of this analysis, variables that have dominant influence on the commitment and performance of the project construction managers will be determined. Then, this study will analyze the difference of commitment between big and small construction project managers and, finally, analyze the difference of performance between big and small construction project managers. &#xD; Some methods are used in this study. First, the Structural Equation Modeling (SEM), which is used to analyze the influence of leadership, organization climate, organization culture, communication climate, trust, work motivation, work experience, reward, and work satisfaction on the commitment and performance, and then the influence of commitment on the performance of construction project managers. Second, Discriminant Analysis, which is used to analyze the difference of commitment between big and small construction project managers and to analyze the difference of performance between big and small construction project managers. Finally, the Delphi Method, is used for validation by simulating and applying the model. &#xD; The results of study indicate that leadership, organization climate, organization culture, communication climate, trust, motivation, work experience, reward, and work satisfaction have a positive and significant influence on the commitment, and then the commitment has a positive and significant influence on the performance. The results of analysis indicate that variables that have dominant influence on the performance are reward, work experience and commitment, while the variables that have dominant influence on the commitment are reward, leadership and organization climate. The results of analysis indicate that variable that discriminate the commitment between big and small construction project managers is motivation (=X6). The results of analysis indicate that variable that discriminate the performance between big and small construction project managers is motivation (=X6).&#xD; &#xD; Key words: Performance, Commitment, Project Manager, SEM Method, Discriminant Method, Delphi Method&#xD; </description><date>2010-04-25</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>File:application/msword</type><identifier>http://eprints.undip.ac.id/38068/1/Bab_I_SAHADI.doc</identifier><type>File:application/msword</type><identifier>http://eprints.undip.ac.id/38068/2/BAB_II_BARU.doc</identifier><type>File:application/msword</type><identifier>http://eprints.undip.ac.id/38068/3/BAB_III_BARU_revisi.doc</identifier><identifier>SAHADI, Sahadi (2010) MODEL FAKTOR-FAKTOR BERPENGARUH TERHADAP KINERJA MANAJER PROYEK KONSTRUKSI. PhD thesis, Program Pascasarjana Undip.</identifier><relation>http://eprints.undip.ac.id/38068/</relation><recordID>38068</recordID></dc>
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
File:application/msword
File
author SAHADI, Sahadi
title MODEL FAKTOR-FAKTOR BERPENGARUH TERHADAP KINERJA MANAJER PROYEK KONSTRUKSI
publishDate 2010
topic TH Building construction
url http://eprints.undip.ac.id/38068/1/Bab_I_SAHADI.doc
http://eprints.undip.ac.id/38068/2/BAB_II_BARU.doc
http://eprints.undip.ac.id/38068/3/BAB_III_BARU_revisi.doc
http://eprints.undip.ac.id/38068/
contents There are various resources that must be managed by a contractor, they include financial, material, equipment, human, and work method resources. These resources are minimum requirements for the completion of a project. In all construction activities, human resource plays the most important role because it controls the use of all other resources. Therefore, human resource will be analyzed in the present study. This study aims to develop a model and analyze the influence of leadership, organization climate, organization culture, communication climate, trust, work motivation, work experience, reward, and work satisfaction on the commitment and performance; and then analyze the influence of commitment on the performance of construction project managers. Next, based on the results of this analysis, variables that have dominant influence on the commitment and performance of the project construction managers will be determined. Then, this study will analyze the difference of commitment between big and small construction project managers and, finally, analyze the difference of performance between big and small construction project managers. Some methods are used in this study. First, the Structural Equation Modeling (SEM), which is used to analyze the influence of leadership, organization climate, organization culture, communication climate, trust, work motivation, work experience, reward, and work satisfaction on the commitment and performance, and then the influence of commitment on the performance of construction project managers. Second, Discriminant Analysis, which is used to analyze the difference of commitment between big and small construction project managers and to analyze the difference of performance between big and small construction project managers. Finally, the Delphi Method, is used for validation by simulating and applying the model. The results of study indicate that leadership, organization climate, organization culture, communication climate, trust, motivation, work experience, reward, and work satisfaction have a positive and significant influence on the commitment, and then the commitment has a positive and significant influence on the performance. The results of analysis indicate that variables that have dominant influence on the performance are reward, work experience and commitment, while the variables that have dominant influence on the commitment are reward, leadership and organization climate. The results of analysis indicate that variable that discriminate the commitment between big and small construction project managers is motivation (=X6). The results of analysis indicate that variable that discriminate the performance between big and small construction project managers is motivation (=X6). Key words: Performance, Commitment, Project Manager, SEM Method, Discriminant Method, Delphi Method
id IOS2852.38068
institution Universitas Diponegoro
institution_id 69
institution_type library:university
library
library Perpustakaan Universitas Diponegoro
library_id 485
collection Diponegoro University Institutional Repository
repository_id 2852
city SEMARANG
province JAWA TENGAH
repoId IOS2852
first_indexed 2016-09-15T18:29:28Z
last_indexed 2016-09-22T21:14:59Z
recordtype dc
_version_ 1683116384966410240
score 17.608942