KETERLAMBATAN WAKTU PELAKSANAAN PROYEK KLASIFIKASI DAN PERINGKAT DARI PENYEBAB-PENYEBABNYA

Main Author: Proboyo, Budiman
Format: Article info application/pdf eJournal
Bahasa: eng
Terbitan: Institute of Research and Community Outreach - Petra Christian University , 2004
Subjects:
Online Access: http://ced.petra.ac.id/index.php/civ/article/view/15507
http://ced.petra.ac.id/index.php/civ/article/view/15507/19974
ctrlnum article-15507
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="en-US">KETERLAMBATAN WAKTU PELAKSANAAN PROYEK KLASIFIKASI DAN PERINGKAT DARI PENYEBAB-PENYEBABNYA</title><creator>Proboyo, Budiman</creator><subject lang="en-US"/><subject lang="en-US">construction delay, causes of delay, planning and scheduling, contractor, owner.</subject><description lang="en-US">Successfully executing construction project within schedule is one of the most important aims, both for the owner and the contractor. Construction delay is a condition which is completely unwanted, because it will cause lost of money and time for both parties. Research in finding factors which are dominant or having great influences as the causes of delay, is intended to prepare and build the construction planning and scheduling more complete and accurate; so that delay can be avoided or controlled. Confirmation to the founded causes by site surveys using questionaire distributed to contractors, have shown that problems arisen from inaccurate workplan, lack of resources. lack of communication/coordination, were dominant factors for causing construction delay from contractor side. On the other hand, the owner side, problems arisen from incomplete and unclear design and scope of works, inspection and control system of the project were dominant for causing delay. Abstract in Bahasa Indonesia : Keberhasilan melaksanakan proyek konstruksi tepat pada waktunya adalah salah satu tujuan terpenting, baik bagi pemilik maupun kontraktor. Keterlambatan adalah sebuah kondisi yang sangat tidak dikehendaki, karena akan sangat merugikan kedua belah pihak dari segi waktu dan biaya. Penelitian ini bertujuan menemukan faktor-faktor yang sangat berperan atau mendominasi sebagai penyebab keterlambatan, dengan maksud agar proses perencanaan dan penjadwalan proyek konstruksi dapat dilakukan dengan lebih lengkap dan cermat; sehingga keterlambatan sedapat mungkin dihindarkan atau dikendalikan. Temuan penyebab-penyebab keterlambatan, yang dikonfirmasikan dengan sigi lapangan menggunakan kuesioner yang didistribusikan kepada kontraktor, menunjukkan bahwa masalah-masalah tidak seksamanya rencana kerja, tidak tersedianya sumber daya dan kurangnya komunikasi/koordinasi, merupakan faktor-faktor yang dominan sebagai penyebab keterlamabatan dari sisi kontraktor. Dari sisi pemilik proyek, masalah ketidaklengkapan dan ketidakjelasan desain dan lingkup pekerjaan, masalah sistim pengawasan dan pengendalian proyek, merupakan faktor yang dominan sebagai penyebab keterlambatan. Kata kunci : keterlambatan pelaksanaan, penyebab keterlambatan, perencanaan dan penjadwalan, kontraktor, pemilik</description><publisher lang="en-US">Institute of Research and Community Outreach - Petra Christian University</publisher><contributor lang="en-US"/><date>2004-06-01</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Other:</type><type>File:application/pdf</type><identifier>http://ced.petra.ac.id/index.php/civ/article/view/15507</identifier><identifier>10.9744/ced.1.1.pp. 46-58</identifier><source lang="en-US">Civil Engineering Dimension; Vol 1, No 1 (1999): MARCH 1999; pp. 46-58</source><source>1979-570X</source><source>1410-9530</source><language>eng</language><relation>http://ced.petra.ac.id/index.php/civ/article/view/15507/19974</relation><coverage lang="en-US"/><coverage lang="en-US"/><coverage lang="en-US"/><recordID>article-15507</recordID></dc>
language eng
format Journal:Article
Journal
Other:info:eu-repo/semantics/publishedVersion
Other
Other:
File:application/pdf
File
Journal:eJournal
author Proboyo, Budiman
title KETERLAMBATAN WAKTU PELAKSANAAN PROYEK KLASIFIKASI DAN PERINGKAT DARI PENYEBAB-PENYEBABNYA
publisher Institute of Research and Community Outreach - Petra Christian University
publishDate 2004
topic construction delay
causes of delay
planning and scheduling
contractor
owner
url http://ced.petra.ac.id/index.php/civ/article/view/15507
http://ced.petra.ac.id/index.php/civ/article/view/15507/19974
contents Successfully executing construction project within schedule is one of the most important aims, both for the owner and the contractor. Construction delay is a condition which is completely unwanted, because it will cause lost of money and time for both parties. Research in finding factors which are dominant or having great influences as the causes of delay, is intended to prepare and build the construction planning and scheduling more complete and accurate; so that delay can be avoided or controlled. Confirmation to the founded causes by site surveys using questionaire distributed to contractors, have shown that problems arisen from inaccurate workplan, lack of resources. lack of communication/coordination, were dominant factors for causing construction delay from contractor side. On the other hand, the owner side, problems arisen from incomplete and unclear design and scope of works, inspection and control system of the project were dominant for causing delay. Abstract in Bahasa Indonesia : Keberhasilan melaksanakan proyek konstruksi tepat pada waktunya adalah salah satu tujuan terpenting, baik bagi pemilik maupun kontraktor. Keterlambatan adalah sebuah kondisi yang sangat tidak dikehendaki, karena akan sangat merugikan kedua belah pihak dari segi waktu dan biaya. Penelitian ini bertujuan menemukan faktor-faktor yang sangat berperan atau mendominasi sebagai penyebab keterlambatan, dengan maksud agar proses perencanaan dan penjadwalan proyek konstruksi dapat dilakukan dengan lebih lengkap dan cermat; sehingga keterlambatan sedapat mungkin dihindarkan atau dikendalikan. Temuan penyebab-penyebab keterlambatan, yang dikonfirmasikan dengan sigi lapangan menggunakan kuesioner yang didistribusikan kepada kontraktor, menunjukkan bahwa masalah-masalah tidak seksamanya rencana kerja, tidak tersedianya sumber daya dan kurangnya komunikasi/koordinasi, merupakan faktor-faktor yang dominan sebagai penyebab keterlamabatan dari sisi kontraktor. Dari sisi pemilik proyek, masalah ketidaklengkapan dan ketidakjelasan desain dan lingkup pekerjaan, masalah sistim pengawasan dan pengendalian proyek, merupakan faktor yang dominan sebagai penyebab keterlambatan. Kata kunci : keterlambatan pelaksanaan, penyebab keterlambatan, perencanaan dan penjadwalan, kontraktor, pemilik
id IOS3114.article-15507
institution Universitas Kristen Petra Surabaya
institution_id 48
institution_type library:university
library
library Perpustakaan Universitas Kristen Petra Surabaya
library_id 533
collection Civil Engineering Dimension
repository_id 3114
subject_area Rekayasa
city KOTA SURABAYA
province JAWA TIMUR
repoId IOS3114
first_indexed 2016-09-23T02:34:06Z
last_indexed 2020-06-12T21:25:29Z
recordtype dc
merged_child_boolean 1
_version_ 1722504830825529344
score 17.60506