RANCANG BANGUN SISTEM PENDUKUNG KEPUTUSAN EVALUASI AKHIR KONTRAKTOR DALAM CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS) PADA PT. PERTAMINA (PERSERO) RU V BALIKPAPAN MENGGUNAKAN METODE FUZZY TOPSIS
Main Author: | FAIZ HAIDAR SATRIANI ADLI, 081311633051 |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | ind |
Terbitan: |
, 2018
|
Subjects: | |
Online Access: |
http://repository.unair.ac.id/70822/1/KKC%20KK%20ST.SI.07-18%20Adl%20r%20ABSTRAK.pdf http://repository.unair.ac.id/70822/2/KKC%20KK%20ST.SI.07-18%20Adl%20r%20SKRIPSI.pdf http://repository.unair.ac.id/70822/ http://lib.unair.ac.id |
Internet
http://repository.unair.ac.id/70822/1/KKC%20KK%20ST.SI.07-18%20Adl%20r%20ABSTRAK.pdfhttp://repository.unair.ac.id/70822/2/KKC%20KK%20ST.SI.07-18%20Adl%20r%20SKRIPSI.pdf
http://repository.unair.ac.id/70822/
http://lib.unair.ac.id
Lokasi
Koleksi | Airlangga Institutional Repositories |
---|---|
Gedung | Perpustakaan Universitas Airlangga |
Institusi | Universitas Airlangga |
Kota | KOTA SURABAYA |
Provinsi | JAWA TIMUR |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |