ctrlnum 27064
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title>Risk Allocation Model For Indonesia's Road Maintenance Project Under Performance Based Contract Scheme</title><creator>Setiawan, Deni</creator><creator>Pribadi, Reini Wirahadikusumah, Krishna S. </creator><creator>Lubis, Harun Al Rasyid </creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>The implementation of Performance Based Contracts (PBC) in Indonesia still has&#xD; many challenges. In terms of risk allocation, PBC allocate more risk to the contractor.&#xD; Certain risks are inherent in all construction projects. Shifting the risk onto one of the&#xD; parties to a construction contract agreement is unfair and expensive. Equitable&#xD; allocation of risks among parties is very important. The allocation of risk between&#xD; road manager and contractor parties in a PBC contract is a critical element of&#xD; success that should be based on an assessment of the party best able to manage it.&#xD; Determining the parties that are most able to bear the risk has been generated from&#xD; various studies both through qualitative and quantitative approaches. Martin Barnes&#xD; (1983) in his research has proposed a risk allocation algorithm to determine which&#xD; parties are most able to accept the risks qualitatively. The purpose of this paper is to&#xD; provide a qualitative risk allocation model for road maintenance projects with PBC&#xD; schemes in Indonesia.&#xD; The study took samples in several national roads in Pantura Lane Road. Risk&#xD; allocation algorithm proposed by Martin Barnes (1983) is applied to determine the&#xD; best able party to manage the risk by considering magnitude and cost of each risk&#xD; factor. The results show that the risk of natural disasters and overloading vehicle risk&#xD; should not bear by the contractors. Force Majeure risk should be allocated to the&#xD; owner by creating an addendum contract for recovery works with unit price payment&#xD; mechanism. If the contractor still bear overloading risk, then the owner must facilitate&#xD; actual traffic volume data and actual total weight data for engineering designing process. This condition indicates that there is a trade-off from the contractor party in&#xD; the bid price as the impact of handling risks.&#xD; </description><publisher>IAEME Publication</publisher><type>Journal:Article</type><type>PeerReview:PeerReviewed</type><type>Book:Book</type><identifier>http://repository.maranatha.edu/27064/1/2.%20Risk%20Allocation%20Model%20for%20Indonesias%20Road%20Maintenance.pdf</identifier><relation>http://www.iaeme.com/ijciet/issues.asp?JType=IJCIET&amp;VType=10&amp;IType=6</relation><identifier> Setiawan, Deni and Pribadi, Reini Wirahadikusumah, Krishna S. and Lubis, Harun Al Rasyid Risk Allocation Model For Indonesia's Road Maintenance Project Under Performance Based Contract Scheme. International Journal of Civil Engineering and Technology (IJCIET), 10 (06). pp. 513-527. ISSN ISSN Print: 0976-6308 and ISSN Online: 0976-6316 </identifier><relation>http://repository.maranatha.edu/27064/</relation><recordID>27064</recordID></dc>
format Journal:Article
Journal
PeerReview:PeerReviewed
PeerReview
Book:Book
Book
author Setiawan, Deni
Pribadi, Reini Wirahadikusumah, Krishna S.
Lubis, Harun Al Rasyid
title Risk Allocation Model For Indonesia's Road Maintenance Project Under Performance Based Contract Scheme
publisher IAEME Publication
topic TA Engineering (General). Civil engineering (General)
url http://repository.maranatha.edu/27064/1/2.%20Risk%20Allocation%20Model%20for%20Indonesias%20Road%20Maintenance.pdf
http://www.iaeme.com/ijciet/issues.asp?JType=IJCIET&VType=10&IType=6
http://repository.maranatha.edu/27064/
contents The implementation of Performance Based Contracts (PBC) in Indonesia still has many challenges. In terms of risk allocation, PBC allocate more risk to the contractor. Certain risks are inherent in all construction projects. Shifting the risk onto one of the parties to a construction contract agreement is unfair and expensive. Equitable allocation of risks among parties is very important. The allocation of risk between road manager and contractor parties in a PBC contract is a critical element of success that should be based on an assessment of the party best able to manage it. Determining the parties that are most able to bear the risk has been generated from various studies both through qualitative and quantitative approaches. Martin Barnes (1983) in his research has proposed a risk allocation algorithm to determine which parties are most able to accept the risks qualitatively. The purpose of this paper is to provide a qualitative risk allocation model for road maintenance projects with PBC schemes in Indonesia. The study took samples in several national roads in Pantura Lane Road. Risk allocation algorithm proposed by Martin Barnes (1983) is applied to determine the best able party to manage the risk by considering magnitude and cost of each risk factor. The results show that the risk of natural disasters and overloading vehicle risk should not bear by the contractors. Force Majeure risk should be allocated to the owner by creating an addendum contract for recovery works with unit price payment mechanism. If the contractor still bear overloading risk, then the owner must facilitate actual traffic volume data and actual total weight data for engineering designing process. This condition indicates that there is a trade-off from the contractor party in the bid price as the impact of handling risks.
id IOS3452.27064
institution Universitas Kristen Maranatha
institution_id 45
institution_type library:university
library
library Perpustakaan Universitas Kristen Maranatha
library_id 530
collection Maranatha Repository System
repository_id 3452
subject_area Ekonomi
Kesehatan dan Kedokteran
Program Komputer dan Teknologi Informasi
city BANDUNG
province JAWA BARAT
repoId IOS3452
first_indexed 2019-10-12T09:52:42Z
last_indexed 2019-11-03T17:58:10Z
recordtype dc
_version_ 1685954317492682752
score 17.608942