Cost prediction model based on system dynamics in water resource project
Main Authors: | Hirijanto, Hirijanto, Mundra, I Wayan, Utomo, Addy |
---|---|
Format: | Proceeding PeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2019
|
Subjects: | |
Online Access: |
http://eprints.itn.ac.id/4253/1/Prosiding%20SCESCM.pdf http://eprints.itn.ac.id/4253/2/Reviewer%20%20Prosiding%20SCESCM.pdf http://eprints.itn.ac.id/4253/4/Cost%20prediction%20model%20basedon%20system%20dynamics%20in%20water%20resource%20project.pdf http://eprints.itn.ac.id/4253/ |
ctrlnum |
4253 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.itn.ac.id/4253/</relation><title>Cost prediction model based on system dynamics in water
resource project</title><creator>Hirijanto, Hirijanto</creator><creator>Mundra, I Wayan</creator><creator>Utomo, Addy</creator><subject>Civil Engineering</subject><description>Project’s cost is one of important components in project achievement. Because of the
uniqueness of construction projects, cost estimation always differs from project to project. The rate
of cost components always change over time make difficult to forecast the cost for the upcoming
project. The cost component consists of many influencing variables where there is interrelationship
each other affecting to the total project cost. This paper objective is to develop a cost prediction
model to assist the project planners in cost estimation for future projects. System dynamic is one of
the appropriate methods to analyse system behaviour with interrelationship referring to the historic
data, so it is able to predict the future project. Developing the model, primary and secondary data
are collected from previous studies, interview with the government planner and survey in Malang
Regency. The model simulation is Brick work unit with its components. Data from last thirteen
years are used to verify and validate the developed model by causal loop diagram as a basic method
in system dynamic. The finding showed that the model is closed to real condition through the
validation mechanism. The developed system is useful in decision making of budget planning based
on work quantity.</description><date>2019</date><type>Journal:Proceeding</type><type>PeerReview:PeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.itn.ac.id/4253/1/Prosiding%20SCESCM.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.itn.ac.id/4253/2/Reviewer%20%20Prosiding%20SCESCM.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.itn.ac.id/4253/4/Cost%20prediction%20model%20basedon%20system%20dynamics%20in%20water%20resource%20project.pdf</identifier><identifier> Hirijanto, Hirijanto and Mundra, I Wayan and Utomo, Addy (2019) Cost prediction model based on system dynamics in water resource project. In: the 4th SCESCM INTERNATIONAL CONFERENCE SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONTRUCTIONS MARTERIALS, Yogyakarta. </identifier><recordID>4253</recordID></dc>
|
language |
eng |
format |
Journal:Proceeding Journal PeerReview:PeerReviewed PeerReview Book:Book Book |
author |
Hirijanto, Hirijanto Mundra, I Wayan Utomo, Addy |
title |
Cost prediction model based on system dynamics in water
resource project |
publishDate |
2019 |
topic |
Civil Engineering |
url |
http://eprints.itn.ac.id/4253/1/Prosiding%20SCESCM.pdf http://eprints.itn.ac.id/4253/2/Reviewer%20%20Prosiding%20SCESCM.pdf http://eprints.itn.ac.id/4253/4/Cost%20prediction%20model%20basedon%20system%20dynamics%20in%20water%20resource%20project.pdf http://eprints.itn.ac.id/4253/ |
contents |
Project’s cost is one of important components in project achievement. Because of the
uniqueness of construction projects, cost estimation always differs from project to project. The rate
of cost components always change over time make difficult to forecast the cost for the upcoming
project. The cost component consists of many influencing variables where there is interrelationship
each other affecting to the total project cost. This paper objective is to develop a cost prediction
model to assist the project planners in cost estimation for future projects. System dynamic is one of
the appropriate methods to analyse system behaviour with interrelationship referring to the historic
data, so it is able to predict the future project. Developing the model, primary and secondary data
are collected from previous studies, interview with the government planner and survey in Malang
Regency. The model simulation is Brick work unit with its components. Data from last thirteen
years are used to verify and validate the developed model by causal loop diagram as a basic method
in system dynamic. The finding showed that the model is closed to real condition through the
validation mechanism. The developed system is useful in decision making of budget planning based
on work quantity. |
id |
IOS7523.4253 |
institution |
Institut Teknologi Nasional Malang |
institution_id |
552 |
institution_type |
library:university library |
library |
Perpustakaan Institut Teknologi Nasional Malang |
library_id |
643 |
collection |
Eprints ITN Malang |
repository_id |
7523 |
subject_area |
Teknik kimia Sipil Geodesy/Geodesi Planologi |
city |
KOTA MALANG |
province |
JAWA TIMUR |
repoId |
IOS7523 |
first_indexed |
2020-03-30T06:29:07Z |
last_indexed |
2020-03-30T06:29:07Z |
recordtype |
dc |
_version_ |
1686544628577206272 |
score |
17.603382 |