ctrlnum 4253
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.itn.ac.id/4253/</relation><title>Cost prediction model based on system dynamics in water&#xD; resource project</title><creator>Hirijanto, Hirijanto</creator><creator>Mundra, I Wayan</creator><creator>Utomo, Addy</creator><subject>Civil Engineering</subject><description>Project&#x2019;s cost is one of important components in project achievement. Because of the&#xD; uniqueness of construction projects, cost estimation always differs from project to project. The rate&#xD; of cost components always change over time make difficult to forecast the cost for the upcoming&#xD; project. The cost component consists of many influencing variables where there is interrelationship&#xD; each other affecting to the total project cost. This paper objective is to develop a cost prediction&#xD; model to assist the project planners in cost estimation for future projects. System dynamic is one of&#xD; the appropriate methods to analyse system behaviour with interrelationship referring to the historic&#xD; data, so it is able to predict the future project. Developing the model, primary and secondary data&#xD; are collected from previous studies, interview with the government planner and survey in Malang&#xD; Regency. The model simulation is Brick work unit with its components. Data from last thirteen&#xD; years are used to verify and validate the developed model by causal loop diagram as a basic method&#xD; in system dynamic. The finding showed that the model is closed to real condition through the&#xD; validation mechanism. The developed system is useful in decision making of budget planning based&#xD; on work quantity.</description><date>2019</date><type>Journal:Proceeding</type><type>PeerReview:PeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.itn.ac.id/4253/1/Prosiding%20SCESCM.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.itn.ac.id/4253/2/Reviewer%20%20Prosiding%20SCESCM.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.itn.ac.id/4253/4/Cost%20prediction%20model%20basedon%20system%20dynamics%20in%20water%20resource%20project.pdf</identifier><identifier> Hirijanto, Hirijanto and Mundra, I Wayan and Utomo, Addy (2019) Cost prediction model based on system dynamics in water resource project. In: the 4th SCESCM INTERNATIONAL CONFERENCE SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONTRUCTIONS MARTERIALS, Yogyakarta. </identifier><recordID>4253</recordID></dc>
language eng
format Journal:Proceeding
Journal
PeerReview:PeerReviewed
PeerReview
Book:Book
Book
author Hirijanto, Hirijanto
Mundra, I Wayan
Utomo, Addy
title Cost prediction model based on system dynamics in water resource project
publishDate 2019
topic Civil Engineering
url http://eprints.itn.ac.id/4253/1/Prosiding%20SCESCM.pdf
http://eprints.itn.ac.id/4253/2/Reviewer%20%20Prosiding%20SCESCM.pdf
http://eprints.itn.ac.id/4253/4/Cost%20prediction%20model%20basedon%20system%20dynamics%20in%20water%20resource%20project.pdf
http://eprints.itn.ac.id/4253/
contents Project’s cost is one of important components in project achievement. Because of the uniqueness of construction projects, cost estimation always differs from project to project. The rate of cost components always change over time make difficult to forecast the cost for the upcoming project. The cost component consists of many influencing variables where there is interrelationship each other affecting to the total project cost. This paper objective is to develop a cost prediction model to assist the project planners in cost estimation for future projects. System dynamic is one of the appropriate methods to analyse system behaviour with interrelationship referring to the historic data, so it is able to predict the future project. Developing the model, primary and secondary data are collected from previous studies, interview with the government planner and survey in Malang Regency. The model simulation is Brick work unit with its components. Data from last thirteen years are used to verify and validate the developed model by causal loop diagram as a basic method in system dynamic. The finding showed that the model is closed to real condition through the validation mechanism. The developed system is useful in decision making of budget planning based on work quantity.
id IOS7523.4253
institution Institut Teknologi Nasional Malang
institution_id 552
institution_type library:university
library
library Perpustakaan Institut Teknologi Nasional Malang
library_id 643
collection Eprints ITN Malang
repository_id 7523
subject_area Teknik kimia
Sipil
Geodesy/Geodesi
Planologi
city KOTA MALANG
province JAWA TIMUR
repoId IOS7523
first_indexed 2020-03-30T06:29:07Z
last_indexed 2020-03-30T06:29:07Z
recordtype dc
_version_ 1686544628577206272
score 17.603382