ANALISIS SUMBERDAYA TERUNJUK BATU ANDESIT MENGGUNAKAN METODE CROSS SECTION DAN METODE TRIANGULAR DI PT. BINTANG SUMATERA PASIFIK, KECAMATAN PANGKALAN KOTO BARU, KABUPATEN LIMA PULUH KOTA, PROVINSI SUMATERA BARAT

Main Authors: Nata, Refky Adi, Suryadi, Rizky Edra
Format: Article info application/pdf eJournal
Bahasa: eng
Terbitan: Jurusan Teknik Pertambangan FT UNP , 2019
Subjects:
Online Access: http://ejournal.unp.ac.id/index.php/mining/article/view/103711
http://ejournal.unp.ac.id/index.php/mining/article/view/103711/101451
ctrlnum article-103711
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="en-US">ANALISIS SUMBERDAYA TERUNJUK BATU ANDESIT MENGGUNAKAN METODE CROSS SECTION DAN METODE TRIANGULAR DI PT. BINTANG SUMATERA PASIFIK, KECAMATAN PANGKALAN KOTO BARU, KABUPATEN LIMA PULUH KOTA, PROVINSI SUMATERA BARAT</title><creator>Nata, Refky Adi</creator><creator>Suryadi, Rizky Edra</creator><subject lang="en-US">Cross Section, Triangular Grouping, Resources, Andesite, Autodesk Land Desktop</subject><description lang="en-US">Abstract. PT. Bintang Sumatera Pasifik is a mining company that operates andesite in Nagari Manggilang Pangkalan, Lima Puluh Kota, West Sumatra. Geographically located at coordinates 100&#x2070; 44 ' 46,3 "East longitude and the 00&#x2070; 01&#x2019;09,8" South latitude. With an area of 6 Ha Mining Permit. This study will count the stones resources using the method of cross section with the distance between the section 20 m, helped by software Rockworks to make pieces of the section as well as create a Block model of sediment stones, and methods triangular grouping who assisted with Autodesk land Desktop software to find out the coordinates of the point of the outcrop. Data processing of the results obtained with andesite resources using the method of cross section of 11.826.129,6 tons (&#x3C1; = 2,7 ton/m3) and by using the method of triangular grouping obtained resources of 6.529.096,512 tons (&#x3C1; = 2,7 ton/m3) with the lower elevation 156 mdpl and limits the upper elevation 277 mdpl.Keywords: Cross Section, Triangular Grouping, Resources, Andesite,&#xA0; Autodesk Land Desktop</description><publisher lang="en-US">Jurusan Teknik Pertambangan FT UNP</publisher><contributor lang="en-US"/><date>2019-03-18</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Journal:Article</type><type>File:application/pdf</type><identifier>http://ejournal.unp.ac.id/index.php/mining/article/view/103711</identifier><source lang="en-US">Bina Tambang; Vol 4, No 1 (2019): JURNAL BINA TAMBANG; 435-444</source><source>2302-3333</source><language>eng</language><relation>http://ejournal.unp.ac.id/index.php/mining/article/view/103711/101451</relation><rights lang="en-US">Copyright (c) 2019 Bina Tambang</rights><recordID>article-103711</recordID></dc>
language eng
format Journal:Article
Journal
Other:info:eu-repo/semantics/publishedVersion
Other
File:application/pdf
File
Journal:eJournal
author Nata, Refky Adi
Suryadi, Rizky Edra
title ANALISIS SUMBERDAYA TERUNJUK BATU ANDESIT MENGGUNAKAN METODE CROSS SECTION DAN METODE TRIANGULAR DI PT. BINTANG SUMATERA PASIFIK, KECAMATAN PANGKALAN KOTO BARU, KABUPATEN LIMA PULUH KOTA, PROVINSI SUMATERA BARAT
publisher Jurusan Teknik Pertambangan FT UNP
publishDate 2019
topic Cross Section
Triangular Grouping
Resources
Andesite
Autodesk Land Desktop
url http://ejournal.unp.ac.id/index.php/mining/article/view/103711
http://ejournal.unp.ac.id/index.php/mining/article/view/103711/101451
contents Abstract. PT. Bintang Sumatera Pasifik is a mining company that operates andesite in Nagari Manggilang Pangkalan, Lima Puluh Kota, West Sumatra. Geographically located at coordinates 1000 44 ' 46,3 "East longitude and the 000 01’09,8" South latitude. With an area of 6 Ha Mining Permit. This study will count the stones resources using the method of cross section with the distance between the section 20 m, helped by software Rockworks to make pieces of the section as well as create a Block model of sediment stones, and methods triangular grouping who assisted with Autodesk land Desktop software to find out the coordinates of the point of the outcrop. Data processing of the results obtained with andesite resources using the method of cross section of 11.826.129,6 tons (ρ = 2,7 ton/m3) and by using the method of triangular grouping obtained resources of 6.529.096,512 tons (ρ = 2,7 ton/m3) with the lower elevation 156 mdpl and limits the upper elevation 277 mdpl.Keywords: Cross Section, Triangular Grouping, Resources, Andesite, Autodesk Land Desktop
id IOS124.article-103711
institution Universitas Negeri Padang
institution_id 56
institution_type library:university
library
library Perpustakaan Universitas Negeri Padang
library_id 565
collection Bina Tambang
repository_id 124
city KOTA PADANG
province SUMATERA BARAT
repoId IOS124
first_indexed 2019-05-02T14:08:57Z
last_indexed 2019-06-30T21:02:15Z
recordtype dc
_version_ 1722433990140362752
score 17.610468