PERENCANAAN JEMBATAN PENYEBERANGAN ORANG DENGAN STRUKTUR BAJA CASTELLATED DAN STRUKTUR BETON PRATEGANG VOIDED SLAB (Studi kasus Kawasan Industri Rembang Pasuruan Jl. Raya Surabaya-Pasuruan Km 50, Raci, Pasuruan)

Main Author: Sugeng Riyanto, Qomariah, Muhammad Ferdian Ramadianto,
Format: Article info application/pdf Journal
Bahasa: eng
Terbitan: Jurusan Teknik Sipil, Politeknik Negeri Malang , 2014
Online Access: http://prokons.polinema.ac.id/index.php/PROKONS/article/view/68
http://prokons.polinema.ac.id/index.php/PROKONS/article/view/68/66
ctrlnum article-68
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="en-US">PERENCANAAN JEMBATAN PENYEBERANGAN ORANG DENGAN STRUKTUR BAJA CASTELLATED DAN STRUKTUR BETON PRATEGANG VOIDED SLAB (Studi kasus Kawasan Industri Rembang Pasuruan Jl. Raya Surabaya-Pasuruan Km 50, Raci, Pasuruan)</title><creator>Sugeng Riyanto, Qomariah, Muhammad Ferdian Ramadianto,</creator><description lang="en-US">The existing traffic conditions at the gate of Pasuruan Industrial Estate Rembang (PIER) located on Surabaya-Pasuruan Highway KM 50, Desa Raci, Bangil, Pasuruan is classified the National Highway type II class 1. It has an average volume of 286 pedestrian / hour (V) and 5175 vehicle / hour (P), so PV2 value is equal to 7.66 x 109. It can be a traffic accident-prone area, especially for pedestrians. Therefore, it needs the facility of Pedestrian Cross Bridge of 17.5 m span and 2.5 m wide. That is why, the writer examines the difference between the two structures in terms of cost. This study comprises planning, detailed engineering design, implementation methods, and cost estimate of castellated steel structures and prestressed concrete voided slab structures.The result of study are as follow : the castellated steel main girder WF 700 x 300 x 13 x 24 at IDR 723,247,800.00 and prestressed concrete voided slab with a size of 970 x 875 diameter 340 mm at IDR 496,282,628.00. From these results, it is concluded that construction of of prestressed concrete voided slab structure is cheaper with price difference IDR 226,965,172.00.Keyword: pedestrian bridge, castellated steel, prestressed concrete voided slab, estimate cost</description><publisher lang="en-US">Jurusan Teknik Sipil, Politeknik Negeri Malang</publisher><contributor lang="en-US"/><date>2014-08-31</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Journal:Article</type><type>File:application/pdf</type><identifier>http://prokons.polinema.ac.id/index.php/PROKONS/article/view/68</identifier><source lang="en-US">Prokons: Jurnal Teknik Sipil; Vol. 8 No. 2 August 2014; 124-133</source><source lang="id-ID">Prokons: Jurnal Teknik Sipil; Vol. 8 No. 2 August 2014; 124-133</source><source>2714-8815</source><source>1978-1784</source><language>eng</language><relation>http://prokons.polinema.ac.id/index.php/PROKONS/article/view/68/66</relation><rights lang="en-US">Copyright (c) 2017 PROKONS Jurnal Teknik Sipil</rights><recordID>article-68</recordID></dc>
language eng
format Journal:Article
Journal
Other:info:eu-repo/semantics/publishedVersion
Other
File:application/pdf
File
Journal:Journal
author Sugeng Riyanto, Qomariah, Muhammad Ferdian Ramadianto,
title PERENCANAAN JEMBATAN PENYEBERANGAN ORANG DENGAN STRUKTUR BAJA CASTELLATED DAN STRUKTUR BETON PRATEGANG VOIDED SLAB (Studi kasus Kawasan Industri Rembang Pasuruan Jl. Raya Surabaya-Pasuruan Km 50, Raci, Pasuruan)
publisher Jurusan Teknik Sipil, Politeknik Negeri Malang
publishDate 2014
url http://prokons.polinema.ac.id/index.php/PROKONS/article/view/68
http://prokons.polinema.ac.id/index.php/PROKONS/article/view/68/66
contents The existing traffic conditions at the gate of Pasuruan Industrial Estate Rembang (PIER) located on Surabaya-Pasuruan Highway KM 50, Desa Raci, Bangil, Pasuruan is classified the National Highway type II class 1. It has an average volume of 286 pedestrian / hour (V) and 5175 vehicle / hour (P), so PV2 value is equal to 7.66 x 109. It can be a traffic accident-prone area, especially for pedestrians. Therefore, it needs the facility of Pedestrian Cross Bridge of 17.5 m span and 2.5 m wide. That is why, the writer examines the difference between the two structures in terms of cost. This study comprises planning, detailed engineering design, implementation methods, and cost estimate of castellated steel structures and prestressed concrete voided slab structures.The result of study are as follow : the castellated steel main girder WF 700 x 300 x 13 x 24 at IDR 723,247,800.00 and prestressed concrete voided slab with a size of 970 x 875 diameter 340 mm at IDR 496,282,628.00. From these results, it is concluded that construction of of prestressed concrete voided slab structure is cheaper with price difference IDR 226,965,172.00.Keyword: pedestrian bridge, castellated steel, prestressed concrete voided slab, estimate cost
id IOS12557.article-68
institution Politeknik Negeri Malang (Polinema)
institution_id 358
institution_type library:university
library
library Jurusan Teknik Sipil (TS) Polinema
library_id 1758
collection PROKONS: Jurnal Teknik Sipil
repository_id 12557
subject_area Stuctural Technique
Geomechanic
Transportation Technique
Contruction Management
city KOTA MALANG
province JAWA TIMUR
shared_to_ipusnas_str 1
repoId IOS12557
first_indexed 2019-12-06T08:47:47Z
last_indexed 2019-12-23T09:20:47Z
recordtype dc
_version_ 1686630336511868928
score 17.610363