Perencanaan Instalasi Pengolahan Air Limbah (IPAL) Komunal di Perumahan Griya Prima Sriwijaya dan Perumahan Deyhan Abadi, Kota Palembang
Main Authors: | Salman, Nurcholis; Program Studi Teknik Lingkungan, Fakultas Teknik, Universitas Muhammadiyah Tasikmalaya, Taqwa, Fadhila Muhammad Libasut; Universitas Ibn Khaldun Bogor, Lutfi, Muhamad; Universitas Ibn Khaldun Bogor |
---|---|
Format: | Article info application/pdf Journal |
Bahasa: | ind |
Terbitan: |
Jurnal Komposit
, 2021
|
Online Access: |
http://ejournal.uika-bogor.ac.id/index.php/komposit/article/view/6294 http://ejournal.uika-bogor.ac.id/index.php/komposit/article/view/6294/3288 |
ctrlnum |
article-6294 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="id-ID">Perencanaan Instalasi Pengolahan Air Limbah (IPAL) Komunal di Perumahan Griya Prima Sriwijaya dan Perumahan Deyhan Abadi, Kota Palembang</title><creator>Salman, Nurcholis; Program Studi Teknik Lingkungan, Fakultas Teknik, Universitas Muhammadiyah Tasikmalaya</creator><creator>Taqwa, Fadhila Muhammad Libasut; Universitas Ibn Khaldun Bogor</creator><creator>Lutfi, Muhamad; Universitas Ibn Khaldun Bogor</creator><description lang="id-ID">ABSTRAK Sebagai upaya peningkatan kualitas hidup dan lingkungan di kawasan permukiman Kota Palembang, dilakukan upaya berupa pengembangan sistem sanitasi melalui program pembangunan Instalasi Pengolahan Air Limbah (IPAL) Komunal, yang berlokasi di Perumahan Griya Prima Sriwijaya dan Perumahan Deyhan Abadi, Kota Palembang. Penelitian dilakukan dengan tujuan untuk merencanakan perangkat IPAL komunal yang efisien dan handal, serta mudah dalam pengoperasian dan perawatannya. Tahapan perencanaan yang dilakukan meliputi pengukuran topografi area perumahan dan penampang melintang sungai, kajian proyeksi timbulan air limbah dan kapasitas IPAL komunal dengan teknologi Anaerobic Baffled Reactor (ABR), termasuk di dalamnya desain sistem perpipaan, desain bak penampungan limbah, desain bak pengendapan awal, desain bak anaerob, desain bak aerob, desain bak pengendapan akhir dan desain bak resapan. Mengingat bahwa kedua perumahan memiliki karakter dan volume timbulan limbah yang tidak berbeda, maka dimensi IPAL komunal yang direncanakan adalah sama besar, dengan kapasitas 200 m3/hari. Berdasarkan perhitungan yang telah dilakukan, dimensi bak penampungan limbah, bak pengendapan awal, bak anaerob, bak aerob, dan bak pengendapan akhir berturut – turut adalah sebesar 40 m3, 70 m3, 45 m3, 25 m3, dan 40 m3.Kata kunci: Instalasi Pengolahan Air Limbah (IPAL) Komunal, Anaerobic Baffled Reactor (ABR), system sanitasi perkotaan.ABSTRACTAs an effort to improve the quality of life and the environment in the residential area of Palembang City, efforts have been made to develop a sanitation system through the Communal Wastewater Treatment Plant (WWTP) construction program, which is located at Griya Prima Sriwijaya Housing and Deyhan Abadi Housing, Palembang City. The research was conducted with the aim of planning an efficient and reliable communal WWTP device, as well as being easy to operate and maintain. The planning stages carried out include measuring the topography of residential areas and river cross sections, studies of projected wastewater generation and the capacity of communal WWTPs with Anaerobic Baffled Reactor (ABR) technology, including the design of the piping system, the design of the waste collection tank, the design of the initial settling basin, the design of the piping system, anaerobic tank design, aerobic tank design, final sedimentation basin design and absorption tank design. Considering that the two housing estates have similar characteristics and volumes of waste generation, the dimensions of the planned communal WWTPs are the same, with a capacity of 200 m3/day. Based on the calculations that have been carried out, the dimensions of the waste collection tank, initial settling basin, anaerobic tank, aerobic tank, and final sedimentation tank are 40 m3, 70 m3, 45 m3, 25 m3, and 40 m3 respectively.Keywords: Wastewater Treatment Plant (WWTP) Communal, Anaerobic Baffled Reactor (ABR), urban sanitation system.</description><publisher lang="en-US">Jurnal Komposit</publisher><contributor lang="id-ID"/><date>2021-12-20</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Journal:Article</type><type>File:application/pdf</type><identifier>http://ejournal.uika-bogor.ac.id/index.php/komposit/article/view/6294</identifier><identifier>10.32832/komposit.v5i2.6294</identifier><source lang="en-US">Jurnal Komposit; Vol 5, No 2 (2021); 95-106</source><source>2655-934X</source><source>3513-2615</source><source>10.32832/komposit.v5i2</source><language>ind</language><relation>http://ejournal.uika-bogor.ac.id/index.php/komposit/article/view/6294/3288</relation><rights lang="en-US">Copyright (c) 2021 Jurnal Komposit</rights><recordID>article-6294</recordID></dc>
|
language |
ind |
format |
Journal:Article Journal Other:info:eu-repo/semantics/publishedVersion Other File:application/pdf File Journal:Journal |
author |
Salman, Nurcholis; Program Studi Teknik Lingkungan, Fakultas Teknik, Universitas Muhammadiyah Tasikmalaya Taqwa, Fadhila Muhammad Libasut; Universitas Ibn Khaldun Bogor Lutfi, Muhamad; Universitas Ibn Khaldun Bogor |
title |
Perencanaan Instalasi Pengolahan Air Limbah (IPAL) Komunal di Perumahan Griya Prima Sriwijaya dan Perumahan Deyhan Abadi, Kota Palembang |
publisher |
Jurnal Komposit |
publishDate |
2021 |
url |
http://ejournal.uika-bogor.ac.id/index.php/komposit/article/view/6294 http://ejournal.uika-bogor.ac.id/index.php/komposit/article/view/6294/3288 |
contents |
ABSTRAK Sebagai upaya peningkatan kualitas hidup dan lingkungan di kawasan permukiman Kota Palembang, dilakukan upaya berupa pengembangan sistem sanitasi melalui program pembangunan Instalasi Pengolahan Air Limbah (IPAL) Komunal, yang berlokasi di Perumahan Griya Prima Sriwijaya dan Perumahan Deyhan Abadi, Kota Palembang. Penelitian dilakukan dengan tujuan untuk merencanakan perangkat IPAL komunal yang efisien dan handal, serta mudah dalam pengoperasian dan perawatannya. Tahapan perencanaan yang dilakukan meliputi pengukuran topografi area perumahan dan penampang melintang sungai, kajian proyeksi timbulan air limbah dan kapasitas IPAL komunal dengan teknologi Anaerobic Baffled Reactor (ABR), termasuk di dalamnya desain sistem perpipaan, desain bak penampungan limbah, desain bak pengendapan awal, desain bak anaerob, desain bak aerob, desain bak pengendapan akhir dan desain bak resapan. Mengingat bahwa kedua perumahan memiliki karakter dan volume timbulan limbah yang tidak berbeda, maka dimensi IPAL komunal yang direncanakan adalah sama besar, dengan kapasitas 200 m3/hari. Berdasarkan perhitungan yang telah dilakukan, dimensi bak penampungan limbah, bak pengendapan awal, bak anaerob, bak aerob, dan bak pengendapan akhir berturut – turut adalah sebesar 40 m3, 70 m3, 45 m3, 25 m3, dan 40 m3.Kata kunci: Instalasi Pengolahan Air Limbah (IPAL) Komunal, Anaerobic Baffled Reactor (ABR), system sanitasi perkotaan.ABSTRACTAs an effort to improve the quality of life and the environment in the residential area of Palembang City, efforts have been made to develop a sanitation system through the Communal Wastewater Treatment Plant (WWTP) construction program, which is located at Griya Prima Sriwijaya Housing and Deyhan Abadi Housing, Palembang City. The research was conducted with the aim of planning an efficient and reliable communal WWTP device, as well as being easy to operate and maintain. The planning stages carried out include measuring the topography of residential areas and river cross sections, studies of projected wastewater generation and the capacity of communal WWTPs with Anaerobic Baffled Reactor (ABR) technology, including the design of the piping system, the design of the waste collection tank, the design of the initial settling basin, the design of the piping system, anaerobic tank design, aerobic tank design, final sedimentation basin design and absorption tank design. Considering that the two housing estates have similar characteristics and volumes of waste generation, the dimensions of the planned communal WWTPs are the same, with a capacity of 200 m3/day. Based on the calculations that have been carried out, the dimensions of the waste collection tank, initial settling basin, anaerobic tank, aerobic tank, and final sedimentation tank are 40 m3, 70 m3, 45 m3, 25 m3, and 40 m3 respectively.Keywords: Wastewater Treatment Plant (WWTP) Communal, Anaerobic Baffled Reactor (ABR), urban sanitation system. |
id |
IOS14320.article-6294 |
institution |
Universitas Ibn Khaldun Bogor |
institution_id |
1951 |
institution_type |
library:university library |
library |
Perpustakaan Universitas Ibn Khaldun Bogor |
library_id |
1577 |
collection |
Jurnal Komposit : Jurnal Ilmu-Ilmu Teknik Sipil |
repository_id |
14320 |
subject_area |
Teknik Sipil |
city |
KOTA BOGOR |
province |
JAWA BARAT |
shared_to_ipusnas_str |
1 |
repoId |
IOS14320 |
first_indexed |
2022-03-02T05:04:13Z |
last_indexed |
2022-03-02T05:04:13Z |
recordtype |
dc |
_version_ |
1726227451582873600 |
score |
17.610468 |