OPTIMALISASI PENENTUAN BIAYA MINIMUM PADA PENGENDALIAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE DYNAMIC PROGRAMMING (STUDI KASUS DI PT. XYZ)
Main Authors: | Oktavianty, Vivin Nur; Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo, Sukmono, Tedjo; Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo |
---|---|
Format: | Article info application/pdf eJournal |
Bahasa: | eng |
Terbitan: |
Universitas Ahmad Dahlan Indonesia
, 2020
|
Subjects: | |
Online Access: |
http://journal.uad.ac.id/index.php/Spektrum/article/view/10972 http://journal.uad.ac.id/index.php/Spektrum/article/view/10972/pdf_11 http://journal.uad.ac.id/index.php/Spektrum/article/downloadSuppFile/10972/1546 |
ctrlnum |
article-10972 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="en-US">OPTIMALISASI PENENTUAN BIAYA MINIMUM PADA PENGENDALIAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE DYNAMIC PROGRAMMING (STUDI KASUS DI PT. XYZ)</title><creator>Oktavianty, Vivin Nur; Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo</creator><creator>Sukmono, Tedjo; Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo</creator><subject lang="en-US">Production System, Inventory Control, Dynamic Programming</subject><description lang="en-US">PT. XYZ is a manufacturing company that produces semi-finished goods, that is imitation leather (PVC). This company has inventory problem in their production process, that is raw material shortages.  The purpose of this study was to determine the amount of calcium carbonate raw materials purchased by PT. XYZ with optimal costs. Before using this Dynamic Programming, the cost of buying raw materials is Rp. 7,345,000,000. From the results of planning the purchase of raw materials for the next 12 periods (January-December 2018) are 1184, 1185.5, 1187.1, 1188.6, 1190.1, 1191.6, 1193.2, 1194.7, 1196.2, 1197.7, 1199.3 and 1200.8 Tons. To compile a production plan by minimizing total production costs, the dynamic programming method is used with the objective function Min Fn(In) = . As a result, the total purchase cost of calcium carbonate raw material is a minimum of Rp. 7,154,355,000. After calculating the cost, it can be seen that after using the dynamic programming method the profits obtained by the company Rp. 114,472,000 compared to before using the dynamic programming method Rp. 111,040,000.</description><publisher lang="en-US">Universitas Ahmad Dahlan Indonesia</publisher><contributor lang="en-US"/><date>2020-05-01</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Other:</type><type>File:application/pdf</type><identifier>http://journal.uad.ac.id/index.php/Spektrum/article/view/10972</identifier><identifier>10.12928/si.v18i1.10972</identifier><source lang="en-US">Spektrum Industri; Vol 18, No 1: April 2020; 15-22</source><source>2442-2630</source><source>1693-6590</source><language>eng</language><relation>http://journal.uad.ac.id/index.php/Spektrum/article/view/10972/pdf_11</relation><relation>http://journal.uad.ac.id/index.php/Spektrum/article/downloadSuppFile/10972/1546</relation><rights lang="0">Copyright (c) 2020 Universitas Ahmad Dahlan</rights><rights lang="0">http://creativecommons.org/licenses/by-sa/4.0</rights><recordID>article-10972</recordID></dc>
|
language |
eng |
format |
Journal:Article Journal Other:info:eu-repo/semantics/publishedVersion Other Other: File:application/pdf File Journal:eJournal |
author |
Oktavianty, Vivin Nur; Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo Sukmono, Tedjo; Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo |
title |
OPTIMALISASI PENENTUAN BIAYA MINIMUM PADA PENGENDALIAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE DYNAMIC PROGRAMMING (STUDI KASUS DI PT. XYZ) |
publisher |
Universitas Ahmad Dahlan Indonesia |
publishDate |
2020 |
topic |
Production System Inventory Control Dynamic Programming |
url |
http://journal.uad.ac.id/index.php/Spektrum/article/view/10972 http://journal.uad.ac.id/index.php/Spektrum/article/view/10972/pdf_11 http://journal.uad.ac.id/index.php/Spektrum/article/downloadSuppFile/10972/1546 |
contents |
PT. XYZ is a manufacturing company that produces semi-finished goods, that is imitation leather (PVC). This company has inventory problem in their production process, that is raw material shortages. The purpose of this study was to determine the amount of calcium carbonate raw materials purchased by PT. XYZ with optimal costs. Before using this Dynamic Programming, the cost of buying raw materials is Rp. 7,345,000,000. From the results of planning the purchase of raw materials for the next 12 periods (January-December 2018) are 1184, 1185.5, 1187.1, 1188.6, 1190.1, 1191.6, 1193.2, 1194.7, 1196.2, 1197.7, 1199.3 and 1200.8 Tons. To compile a production plan by minimizing total production costs, the dynamic programming method is used with the objective function Min Fn(In) = . As a result, the total purchase cost of calcium carbonate raw material is a minimum of Rp. 7,154,355,000. After calculating the cost, it can be seen that after using the dynamic programming method the profits obtained by the company Rp. 114,472,000 compared to before using the dynamic programming method Rp. 111,040,000. |
id |
IOS160.article-10972 |
institution |
Universitas Ahmad Dahlan |
institution_id |
62 |
institution_type |
library:university library |
library |
Perpustakaan Universitas Ahmad Dahlan |
library_id |
467 |
collection |
Bulletin of Electrical Engineering and Informatics |
repository_id |
160 |
subject_area |
Rekayasa |
city |
KOTA YOGYAKARTA |
province |
DAERAH ISTIMEWA YOGYAKARTA |
repoId |
IOS160 |
first_indexed |
2020-08-04T02:29:21Z |
last_indexed |
2020-08-04T02:29:21Z |
recordtype |
dc |
merged_child_boolean |
1 |
_version_ |
1722437689032048640 |
score |
17.203505 |