Analisa kelayakan ekonomi proyek kereta cepat Jakarta-Surabaya berbasis konsep rekayasa nilai dengan proyeksi pendapatan menggunakan sistem dinamik = Economic feasibility study on Jakarta Surabaya high speed train project base on value engineering concept with potential revenue projection using dinamic sistem / Tria Puspita Sari

Main Author: Tria Puspita Sari, author
Format: Bachelors
Terbitan: , 2016
Subjects:
Online Access: http://lib.ui.ac.id/file?file=digital/2016-11/20431446-S63515-Tria Puspita Sari.pdf
ctrlnum 20431446
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title>Analisa kelayakan ekonomi proyek kereta cepat Jakarta-Surabaya berbasis konsep rekayasa nilai dengan proyeksi pendapatan menggunakan sistem dinamik = Economic feasibility study on Jakarta Surabaya high speed train project base on value engineering concept with potential revenue projection using dinamic sistem / Tria Puspita Sari</title><creator>Tria Puspita Sari, author</creator><type>Thesis:Bachelors</type><place/><publisher/><date>2016</date><description>&lt;b&gt;ABSTRAK&lt;/b&gt;&lt;br&gt; Kereta cepat Jakarta-Surabaya memiliki jalur sepanjang 868 Km melewati tujuh kota/stasiun yaitu, Jakarta, Bandung,Cirebon, Semarang, Solo, Jogjakarta, dan Surabaya (CSID,2015). Pada proyek ini dilakukan rekasaya nilai tambah dengan menambahkan fungsi tambah berupa, penyewaan kawasan komersil dan periklanan stasiun (PTS), pengembangan kawasan pariwisata, pengembangan kawasan transit oriented development (TOD), Integrasi fiber optic(FO), Integrasi solar cell (SC), dalam rangka peningkatan pendapatan dan peningkatan kelayakan terhadap biaya. Analisa pendapatan dilakukan dengan simulasi sistem dinamik menggunakan perangkat lunak PowerSim Studio, dan Analisa kelayakan ekonomi dilakukan dengan membandingkan internal rate of return (IRR) dari tiga skenario tarif terhadap MARR. Skenario tarif dilakukan dengan dengan mempertimbangkan harga moda transportasi dan jasa lain terkait yang telah ada, serta Revenue didapatkan dengan proyeksi pemenuhan demand dan ketersediaan dari masing-masing fungsi. Revenue total skenario tarif terendah sebesar Rp. 548,7 trilliun, revenue total skenario tarif menengah sebesar Rp. 737,7 Trilliun, revenue total skenario tarif tertinggi sebesar Rp. 948,3 Trilliun. IRR total proyek meningkat dari 5%-14% dengan fungsi tunggal sebagai sarana transportasi menjadi sebesar 12.3%- 23.0% multifungsi (melaui nilai tambah). &lt;hr&gt; &lt;b&gt;ABSTRACT&lt;/b&gt;&lt;br&gt; Jakarta-Surabaya High Speed Train Project with 868 Km long rute thtough seven cities/stations, Jakarta, Bandung, Cirebon, Semarang, Solo, Jogjakarta, and Surabaya. In this project value engineering is added by adding some fungtions as leasing comercial areas and adverstising in station (PTS), developing tourism area, developing transit oriented development (TOD) areas, Integrating fiber optic and integrating solar cell in order to increase income and an increase in the cost feasibility. Revenue analysis conducted by simulation of dynamic systems using software Powersim Studio, and economic feasibility analysis is done by comparing the internal rate of return (IRR) of the three scenarios against MARR rates. Fare Scenario done by consideration to existing transportation and service price, also revenue resulted of compliance with projected demand and availability of each function. Total revenue of lowest possible rate scenarios is Rp. 548.7 trillion, total revenue scenario intermediate rate of Rp. 737.7 Trillion, total revenue scenario of the highest rates of Rp. 948.3 Trillion. The total project IRR increases of 5%- 14% with a single function as transportation mode become 12.3%-23.0% as multifunctions (through value added).</description><subject>High speed trains</subject><subject>Value analysis (Cost control)</subject><subject>Dynamics</subject><subject>Railroads</subject><identifier>20431446</identifier><source>http://lib.ui.ac.id/file?file=digital/2016-11/20431446-S63515-Tria Puspita Sari.pdf</source><recordID>20431446</recordID></dc>
format Thesis:Bachelors
Thesis
author Tria Puspita Sari, author
title Analisa kelayakan ekonomi proyek kereta cepat Jakarta-Surabaya berbasis konsep rekayasa nilai dengan proyeksi pendapatan menggunakan sistem dinamik = Economic feasibility study on Jakarta Surabaya high speed train project base on value engineering concept with potential revenue projection using dinamic sistem / Tria Puspita Sari
publishDate 2016
topic High speed trains
Value analysis (Cost control)
Dynamics
Railroads
url http://lib.ui.ac.id/file?file=digital/2016-11/20431446-S63515-Tria Puspita Sari.pdf
contents <b>ABSTRAK</b><br> Kereta cepat Jakarta-Surabaya memiliki jalur sepanjang 868 Km melewati tujuh kota/stasiun yaitu, Jakarta, Bandung,Cirebon, Semarang, Solo, Jogjakarta, dan Surabaya (CSID,2015). Pada proyek ini dilakukan rekasaya nilai tambah dengan menambahkan fungsi tambah berupa, penyewaan kawasan komersil dan periklanan stasiun (PTS), pengembangan kawasan pariwisata, pengembangan kawasan transit oriented development (TOD), Integrasi fiber optic(FO), Integrasi solar cell (SC), dalam rangka peningkatan pendapatan dan peningkatan kelayakan terhadap biaya. Analisa pendapatan dilakukan dengan simulasi sistem dinamik menggunakan perangkat lunak PowerSim Studio, dan Analisa kelayakan ekonomi dilakukan dengan membandingkan internal rate of return (IRR) dari tiga skenario tarif terhadap MARR. Skenario tarif dilakukan dengan dengan mempertimbangkan harga moda transportasi dan jasa lain terkait yang telah ada, serta Revenue didapatkan dengan proyeksi pemenuhan demand dan ketersediaan dari masing-masing fungsi. Revenue total skenario tarif terendah sebesar Rp. 548,7 trilliun, revenue total skenario tarif menengah sebesar Rp. 737,7 Trilliun, revenue total skenario tarif tertinggi sebesar Rp. 948,3 Trilliun. IRR total proyek meningkat dari 5%-14% dengan fungsi tunggal sebagai sarana transportasi menjadi sebesar 12.3%- 23.0% multifungsi (melaui nilai tambah). <hr> <b>ABSTRACT</b><br> Jakarta-Surabaya High Speed Train Project with 868 Km long rute thtough seven cities/stations, Jakarta, Bandung, Cirebon, Semarang, Solo, Jogjakarta, and Surabaya. In this project value engineering is added by adding some fungtions as leasing comercial areas and adverstising in station (PTS), developing tourism area, developing transit oriented development (TOD) areas, Integrating fiber optic and integrating solar cell in order to increase income and an increase in the cost feasibility. Revenue analysis conducted by simulation of dynamic systems using software Powersim Studio, and economic feasibility analysis is done by comparing the internal rate of return (IRR) of the three scenarios against MARR rates. Fare Scenario done by consideration to existing transportation and service price, also revenue resulted of compliance with projected demand and availability of each function. Total revenue of lowest possible rate scenarios is Rp. 548.7 trillion, total revenue scenario intermediate rate of Rp. 737.7 Trillion, total revenue scenario of the highest rates of Rp. 948.3 Trillion. The total project IRR increases of 5%- 14% with a single function as transportation mode become 12.3%-23.0% as multifunctions (through value added).
id IOS18064.20431446
institution Universitas Indonesia
institution_id 51
institution_type library:university
library
library Perpustakaan Universitas Indonesia
library_id 492
collection Repository Skripsi (open) Universitas Indonesia
repository_id 18064
city KOTA DEPOK
province JAWA BARAT
repoId IOS18064
first_indexed 2022-12-13T08:57:49Z
last_indexed 2022-12-13T08:57:49Z
recordtype dc
merged_child_boolean 1
_version_ 1752187040357679106
score 17.205004