Analisis dan pemodelan penjadualan produksi untuk multiproduct - multistage dengan metode genetic algorithm di PT. Hitachi construction machinery Indonesia = Analysis and modeling of multiproduct - multistage scheduling using genetic algorthm in PT. Hitachi construction machinery Indonesia

Main Authors: Dedi Rachadi, author, Add author: Amar Rachman, supervisor, Add author: Fauzi Dianawati, supervisor, Add author: Boy Nurtjahyo Moch., examiner, Add author: Erlinda Muslim, examiner, Add author: Isti Surjandari Prajitno, examiner
Format: Masters Bachelors
Terbitan: Universitas Indonesia , 2008
Online Access: https://lib.ui.ac.id/detail?id=20275093
ctrlnum 20275093
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><type>Thesis:Masters</type><title>Analisis dan pemodelan penjadualan produksi untuk multiproduct - multistage dengan metode genetic algorithm di PT. Hitachi construction machinery Indonesia = Analysis and modeling of multiproduct - multistage scheduling using genetic algorthm in PT. Hitachi construction machinery Indonesia</title><creator>Dedi Rachadi, author</creator><creator>Add author: Amar Rachman, supervisor</creator><creator>Add author: Fauzi Dianawati, supervisor</creator><creator>Add author: Boy Nurtjahyo Moch., examiner</creator><creator>Add author: Erlinda Muslim, examiner</creator><creator>Add author: Isti Surjandari Prajitno, examiner</creator><publisher>Universitas Indonesia</publisher><date>2008</date><subject/><description>Penelitian ini mengenai pemodelan untuk penjadualan produksi mini boom dan mini arm di PT. Hitachi Construction Machinery Indonesia. Proses produksi untuk kedua produk ini memiliki tipikal flexible flow shop dengan variasi type barang mencapai 12 jenis. Setiap type barang harus melalui tiga tahapan proses yang harus dilakukan secara berurut. Adanya limitasi fleksibilitas proses pada dua buah tahapan menyebabkan masalah penjadualan menjadi kompleks. Pendekatan yang dilakukan untuk memecahkan masalah penjadualan ini adalah dengan menerapkan dua metode dispatching rule, yaitu SPT (shortest processing time) dan EFT (earliest finish time). Metode lain yang digunakan adalah pengelompokan unit pesanan ke dalam sebuah family untuk meminimalkan kendala limitasi fleksibilitas proses pada dua buah tahapan. Kombinasi ketiga metode ini dituangkan ke dalam suatu algoritma multiproduct-multistage dan diaplikasikan pada inisialisasi solusi. Dari inisialisasi solusi ini dihasilkan penjadualan awal untuk masing-masing tahapan. Optimasi dilakukan terhadap inisisalisasi solusi dengan menggunakan Genetic Algorithm. Genetic Algorithm akan mencari solusi terbaik yang mendekati optimal melalui serangkaian proses seleksi terhadap sekumpulan alternatif solusi yang ada. &lt;hr&gt; The study concerns in modeling the production schedule of mini boom and mini arm in PT. Hitachi Construction Machinery Indonesia. The process of both products is categorized as flexible flow shop with 12 different types of product. Each product is processed through three stages with fixed sequence. There is a limitation of process flexibility among two of three stages that also causes the scheduling become difficult to arrange. Some dispatching rule is applied to solve the schedule problem. SPT (shortest processing time) and EFT (earliest finish time) is the two of dispatching rule which used for this kinds of problem. The other method that also carried out with those two dispatching rule is job families approaching. Job families approaching will minimize the effect of limited process flexibility. Those combined methods will be developed to be an algorithm called multiproduct-multistage algorithm and applied to the initial solution. The initial solution consists of the schedule of each stage. Initial solution is optimized by using Genetic Algorithm. Genetic Algorithm is search process of the best solutions among possible solutions by simulating the natural evolutionary process.</description><identifier>https://lib.ui.ac.id/detail?id=20275093</identifier><recordID>20275093</recordID></dc>
format Thesis:Masters
Thesis
Thesis:Bachelors
author Dedi Rachadi, author
Add author: Amar Rachman, supervisor
Add author: Fauzi Dianawati, supervisor
Add author: Boy Nurtjahyo Moch., examiner
Add author: Erlinda Muslim, examiner
Add author: Isti Surjandari Prajitno, examiner
title Analisis dan pemodelan penjadualan produksi untuk multiproduct - multistage dengan metode genetic algorithm di PT. Hitachi construction machinery Indonesia = Analysis and modeling of multiproduct - multistage scheduling using genetic algorthm in PT. Hitachi construction machinery Indonesia
publisher Universitas Indonesia
publishDate 2008
url https://lib.ui.ac.id/detail?id=20275093
contents Penelitian ini mengenai pemodelan untuk penjadualan produksi mini boom dan mini arm di PT. Hitachi Construction Machinery Indonesia. Proses produksi untuk kedua produk ini memiliki tipikal flexible flow shop dengan variasi type barang mencapai 12 jenis. Setiap type barang harus melalui tiga tahapan proses yang harus dilakukan secara berurut. Adanya limitasi fleksibilitas proses pada dua buah tahapan menyebabkan masalah penjadualan menjadi kompleks. Pendekatan yang dilakukan untuk memecahkan masalah penjadualan ini adalah dengan menerapkan dua metode dispatching rule, yaitu SPT (shortest processing time) dan EFT (earliest finish time). Metode lain yang digunakan adalah pengelompokan unit pesanan ke dalam sebuah family untuk meminimalkan kendala limitasi fleksibilitas proses pada dua buah tahapan. Kombinasi ketiga metode ini dituangkan ke dalam suatu algoritma multiproduct-multistage dan diaplikasikan pada inisialisasi solusi. Dari inisialisasi solusi ini dihasilkan penjadualan awal untuk masing-masing tahapan. Optimasi dilakukan terhadap inisisalisasi solusi dengan menggunakan Genetic Algorithm. Genetic Algorithm akan mencari solusi terbaik yang mendekati optimal melalui serangkaian proses seleksi terhadap sekumpulan alternatif solusi yang ada. <hr> The study concerns in modeling the production schedule of mini boom and mini arm in PT. Hitachi Construction Machinery Indonesia. The process of both products is categorized as flexible flow shop with 12 different types of product. Each product is processed through three stages with fixed sequence. There is a limitation of process flexibility among two of three stages that also causes the scheduling become difficult to arrange. Some dispatching rule is applied to solve the schedule problem. SPT (shortest processing time) and EFT (earliest finish time) is the two of dispatching rule which used for this kinds of problem. The other method that also carried out with those two dispatching rule is job families approaching. Job families approaching will minimize the effect of limited process flexibility. Those combined methods will be developed to be an algorithm called multiproduct-multistage algorithm and applied to the initial solution. The initial solution consists of the schedule of each stage. Initial solution is optimized by using Genetic Algorithm. Genetic Algorithm is search process of the best solutions among possible solutions by simulating the natural evolutionary process.
id IOS18065.20275093
institution Universitas Indonesia
institution_id 51
institution_type library:university
library
library Perpustakaan Universitas Indonesia
library_id 492
collection Repository Skripsi (Membership) Universitas Indonesia
repository_id 18065
city KOTA DEPOK
province JAWA BARAT
repoId IOS18065
first_indexed 2022-12-14T03:01:25Z
last_indexed 2022-12-14T03:01:25Z
recordtype dc
merged_child_boolean 1
_version_ 1752198675492241408
score 17.610468