Kajian Penundaan Produksi Minyak Bumi Akibat Penerapan Sistem Kontrak Terintegrasi = Oil production delay originated from the application of integrated contract

Main Authors: M.A. Andromedae, author, Add author: Lubis, Andi Fahmi, supervisor, Add author: Ayudha D. Prayoga, examiner, Add author: Manurung, Mandala, examiner
Format: Masters Thesis
Terbitan: Universitas Indonesia , 2011
Subjects:
Online Access: https://lib.ui.ac.id/detail?id=20302792

Internet

https://lib.ui.ac.id/detail?id=20302792

Lokasi

Koleksi contoh Repository Tesis (Open) Universitas Indonesia
Gedung Perpustakaan Universitas Indonesia
Institusi Universitas Indonesia
Kota KOTA DEPOK
Provinsi JAWA BARAT
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.