Analisis project cost variance di perusahaan jasa inspeksi teknik pada industri minyak dan gas bumi = project cost variance analysis at technical inspection service company in oil and gas industry
Main Authors: | Fibri Kusumawardani, author, Add author: M. Dachyar, supervisor, Add author: Yadrifil, supervisor, Add author: Sri Bintang Pamungkas, 1945-, examiner, Add author: Teuku Yuri M. Zagloel, examiner, Add author: Fauzia Dianawati, examiner, Add author: Armand Omar Moeis, examiner |
---|---|
Format: | Masters Doctoral |
Terbitan: |
, 2009
|
Subjects: | |
Online Access: |
https://lib.ui.ac.id/detail?id=123026 |
ctrlnum |
123026 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><type>Thesis:Masters</type><title>Analisis project cost variance di perusahaan jasa inspeksi teknik pada industri minyak dan gas bumi = project cost variance analysis at technical inspection service company in oil and gas industry</title><creator>Fibri Kusumawardani, author</creator><creator>Add author: M. Dachyar, supervisor</creator><creator>Add author: Yadrifil, supervisor</creator><creator>Add author: Sri Bintang Pamungkas, 1945-, examiner</creator><creator>Add author: Teuku Yuri M. Zagloel, examiner</creator><creator>Add author: Fauzia Dianawati, examiner</creator><creator>Add author: Armand Omar Moeis, examiner</creator><publisher/><date>2009</date><subject>Project management - cost effectiveness</subject><description><b>ABSTRAK</b><br>
Proyek inspeksi teknis dan sertifikasi pada Perusahaan Jasa Inspeksi Teknik memerlukan manajemen biaya proyek yang efektif. Pelaksanaan proyek, aktualnya sering terjadi cost variance. Penelitian ini berfokus pada analisis project cost variance (CV) antara biaya yang dianggarkan dengan biaya aktual proyek. Metode PMBOK digunakan untuk menghitung nilai CV setiap biaya dan mengetahui pada biaya mana CV sering terjadi. Nilai CV digunakan dalam menentukan nilai cost performance index untuk mengetahui performa biaya underrun (dibawah anggaran) dan overrun (melebihi anggaran) sehingga diperoleh %CV untuk kedua kondisi tersebut. Dengan penelitian ini dianalisis proses cost estimating, cost budgeting, dan cost control yang dapat diimplementasikan oleh PJIT.
<hr>
<b>ABSTRACT</b><br>
Effective project cost management needed by technical inspection and certification project in Technical Inspection and Certification Companies. In actual, cost variance occured in perform of the project. This research is focus to project cost variance (CV) analysis between budgeted cost with actual project cost. PMBOK method is used to calculate CV value of each cost to identify in which cost the CV occurred. CV value is used to calculate cost performance index value to get cost performance that underrun and overrun, and get the %CV value. This research analyzed the cost estimating, cost budgeting, and cost control processes that can be implemented in PJIT.</description><identifier>https://lib.ui.ac.id/detail?id=123026</identifier><recordID>123026</recordID></dc>
|
format |
Thesis:Masters Thesis Thesis:Doctoral |
author |
Fibri Kusumawardani, author Add author: M. Dachyar, supervisor Add author: Yadrifil, supervisor Add author: Sri Bintang Pamungkas, 1945-, examiner Add author: Teuku Yuri M. Zagloel, examiner Add author: Fauzia Dianawati, examiner Add author: Armand Omar Moeis, examiner |
title |
Analisis project cost variance di perusahaan jasa inspeksi teknik pada industri minyak dan gas bumi = project cost variance analysis at technical inspection service company in oil and gas industry |
publishDate |
2009 |
topic |
Project management - cost effectiveness |
url |
https://lib.ui.ac.id/detail?id=123026 |
contents |
<b>ABSTRAK</b><br>
Proyek inspeksi teknis dan sertifikasi pada Perusahaan Jasa Inspeksi Teknik memerlukan manajemen biaya proyek yang efektif. Pelaksanaan proyek, aktualnya sering terjadi cost variance. Penelitian ini berfokus pada analisis project cost variance (CV) antara biaya yang dianggarkan dengan biaya aktual proyek. Metode PMBOK digunakan untuk menghitung nilai CV setiap biaya dan mengetahui pada biaya mana CV sering terjadi. Nilai CV digunakan dalam menentukan nilai cost performance index untuk mengetahui performa biaya underrun (dibawah anggaran) dan overrun (melebihi anggaran) sehingga diperoleh %CV untuk kedua kondisi tersebut. Dengan penelitian ini dianalisis proses cost estimating, cost budgeting, dan cost control yang dapat diimplementasikan oleh PJIT.
<hr>
<b>ABSTRACT</b><br>
Effective project cost management needed by technical inspection and certification project in Technical Inspection and Certification Companies. In actual, cost variance occured in perform of the project. This research is focus to project cost variance (CV) analysis between budgeted cost with actual project cost. PMBOK method is used to calculate CV value of each cost to identify in which cost the CV occurred. CV value is used to calculate cost performance index value to get cost performance that underrun and overrun, and get the %CV value. This research analyzed the cost estimating, cost budgeting, and cost control processes that can be implemented in PJIT. |
id |
IOS18068.123026 |
institution |
Universitas Indonesia |
institution_id |
51 |
institution_type |
library:university library |
library |
Perpustakaan Universitas Indonesia |
library_id |
492 |
collection |
Repository Disertasi (Membership) Universitas Indonesia |
repository_id |
18068 |
city |
KOTA DEPOK |
province |
JAWA BARAT |
repoId |
IOS18068 |
first_indexed |
2022-12-14T04:11:14Z |
last_indexed |
2022-12-14T04:11:14Z |
recordtype |
dc |
merged_child_boolean |
1 |
_version_ |
1752197477570707456 |
score |
17.610468 |