Pengaruh Biaya Pekerjaan Temporary Terhadap Kinerja Biaya Akhir Proyek Pada Pembangunan Gedung Pabrik Di PT. X = Effect of temporary work to final cost performance project at building factory in PT X

Main Authors: Arief Hendratno, author, Add author: Yusuf Latief, supervisor, Add author: Asiyanto, supervisor, Add author: Krisna Mochtar, examiner, Add author: Ismeth Abidin, examiner, Add author: Wisnu Isvara, examiner, Add author: Agus Subiyakto, examiner
Format: Masters Doctoral
Terbitan: , 2011
Subjects:
Online Access: https://lib.ui.ac.id/detail?id=20305444
ctrlnum 20305444
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><type>Thesis:Masters</type><title>Pengaruh Biaya Pekerjaan Temporary Terhadap Kinerja Biaya Akhir Proyek Pada Pembangunan Gedung Pabrik Di PT. X = Effect of temporary work to final cost performance project at building factory in PT X</title><creator>Arief Hendratno, author</creator><creator>Add author: Yusuf Latief, supervisor</creator><creator>Add author: Asiyanto, supervisor</creator><creator>Add author: Krisna Mochtar, examiner</creator><creator>Add author: Ismeth Abidin, examiner</creator><creator>Add author: Wisnu Isvara, examiner</creator><creator>Add author: Agus Subiyakto, examiner</creator><publisher/><date>2011</date><subject>Project final Cost Performance</subject><description>[&lt;b&gt;ABSTRAK&lt;/b&gt;&lt;br&gt; Kesuksesan suatu proyek konstruksi, salah satunya diperoleh dari pengendalian biaya pekerjaan temporary. Pengendalian ini dapat berpengaruh pada kinerja biaya akhir proyek. Penelitian ini bertujuan untuk mengetahui seberapa jauh pengaruh biaya pekerjaan temporary terhadap kinerja biaya akhir proyek. Pekerjaan temporary dapat digolongkan menjadi tiga yaitu : Common Temporary work, Direct Temporary work dan Site Expenses. Penelitian dikhususkan pada bangunan pabrik yang dikerjakan oleh PT.X. Pengolahan data dilakukan dengan menggunakan metode deskriptive exploration, yaitu hasil survey berupa kuesioner dan wawancara dari pakar dan responden. Hasil dari penelitian ini adalah untuk mengetahui variabel variabel dalam pekerjaan temporary yang paling berpengaruh terhadap kinerja biaya akhir proyek. &lt;hr&gt; &lt;b&gt;ABSTRACT&lt;/b&gt;&lt;br&gt; The success of a construction project, one of which is obtained from temporary work cost control. This control can affect the performance of the final cost of the project. This study aims to determine how much influence the cost of temporary works on the performance of the final cost of the project. Temporary works can be classified into three namely: Common Temporary Work, Direct Temporary Work and Site Expenses. Specialized research on a factory building which was done by PT.X. Data processing is done by using descriptive exploration method, namely a questionnaire survey and interviews of experts and respondents. The results of this study was to determine the temporary variables in the work of the most influential on the performance of the final cost of the project., The success of a construction project, one of which is obtained from temporary work cost control. This control can affect the performance of the final cost of the project. This study aims to determine how much influence the cost of temporary works on the performance of the final cost of the project. Temporary works can be classified into three namely: Common Temporary Work, Direct Temporary Work and Site Expenses. Specialized research on a factory building which was done by PT.X. Data processing is done by using descriptive exploration method, namely a questionnaire survey and interviews of experts and respondents. The results of this study was to determine the temporary variables in the work of the most influential on the performance of the final cost of the project.]</description><identifier>https://lib.ui.ac.id/detail?id=20305444</identifier><recordID>20305444</recordID></dc>
format Thesis:Masters
Thesis
Thesis:Doctoral
author Arief Hendratno, author
Add author: Yusuf Latief, supervisor
Add author: Asiyanto, supervisor
Add author: Krisna Mochtar, examiner
Add author: Ismeth Abidin, examiner
Add author: Wisnu Isvara, examiner
Add author: Agus Subiyakto, examiner
title Pengaruh Biaya Pekerjaan Temporary Terhadap Kinerja Biaya Akhir Proyek Pada Pembangunan Gedung Pabrik Di PT. X = Effect of temporary work to final cost performance project at building factory in PT X
publishDate 2011
topic Project final Cost Performance
url https://lib.ui.ac.id/detail?id=20305444
contents [<b>ABSTRAK</b><br> Kesuksesan suatu proyek konstruksi, salah satunya diperoleh dari pengendalian biaya pekerjaan temporary. Pengendalian ini dapat berpengaruh pada kinerja biaya akhir proyek. Penelitian ini bertujuan untuk mengetahui seberapa jauh pengaruh biaya pekerjaan temporary terhadap kinerja biaya akhir proyek. Pekerjaan temporary dapat digolongkan menjadi tiga yaitu : Common Temporary work, Direct Temporary work dan Site Expenses. Penelitian dikhususkan pada bangunan pabrik yang dikerjakan oleh PT.X. Pengolahan data dilakukan dengan menggunakan metode deskriptive exploration, yaitu hasil survey berupa kuesioner dan wawancara dari pakar dan responden. Hasil dari penelitian ini adalah untuk mengetahui variabel variabel dalam pekerjaan temporary yang paling berpengaruh terhadap kinerja biaya akhir proyek. <hr> <b>ABSTRACT</b><br> The success of a construction project, one of which is obtained from temporary work cost control. This control can affect the performance of the final cost of the project. This study aims to determine how much influence the cost of temporary works on the performance of the final cost of the project. Temporary works can be classified into three namely: Common Temporary Work, Direct Temporary Work and Site Expenses. Specialized research on a factory building which was done by PT.X. Data processing is done by using descriptive exploration method, namely a questionnaire survey and interviews of experts and respondents. The results of this study was to determine the temporary variables in the work of the most influential on the performance of the final cost of the project., The success of a construction project, one of which is obtained from temporary work cost control. This control can affect the performance of the final cost of the project. This study aims to determine how much influence the cost of temporary works on the performance of the final cost of the project. Temporary works can be classified into three namely: Common Temporary Work, Direct Temporary Work and Site Expenses. Specialized research on a factory building which was done by PT.X. Data processing is done by using descriptive exploration method, namely a questionnaire survey and interviews of experts and respondents. The results of this study was to determine the temporary variables in the work of the most influential on the performance of the final cost of the project.]
id IOS18068.20305444
institution Universitas Indonesia
institution_id 51
institution_type library:university
library
library Perpustakaan Universitas Indonesia
library_id 492
collection Repository Disertasi (Membership) Universitas Indonesia
repository_id 18068
city KOTA DEPOK
province JAWA BARAT
repoId IOS18068
first_indexed 2022-12-14T04:11:48Z
last_indexed 2022-12-14T04:11:48Z
recordtype dc
merged_child_boolean 1
_version_ 1752197873630445568
score 17.610468