Pengaruh Biaya Pekerjaan Temporary Terhadap Kinerja Biaya Akhir Proyek Pada Pembangunan Gedung Pabrik Di PT. X = Effect of temporary work to final cost performance project at building factory in PT X
Main Authors: | Arief Hendratno, author, Add author: Yusuf Latief, supervisor, Add author: Asiyanto, supervisor, Add author: Krisna Mochtar, examiner, Add author: Ismeth Abidin, examiner, Add author: Wisnu Isvara, examiner, Add author: Agus Subiyakto, examiner |
---|---|
Format: | Masters Doctoral |
Terbitan: |
, 2011
|
Subjects: | |
Online Access: |
https://lib.ui.ac.id/detail?id=20305444 |
ctrlnum |
20305444 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><type>Thesis:Masters</type><title>Pengaruh Biaya Pekerjaan Temporary Terhadap Kinerja Biaya Akhir Proyek Pada Pembangunan Gedung Pabrik Di PT. X = Effect of temporary work to final cost performance project at building factory in PT X</title><creator>Arief Hendratno, author</creator><creator>Add author: Yusuf Latief, supervisor</creator><creator>Add author: Asiyanto, supervisor</creator><creator>Add author: Krisna Mochtar, examiner</creator><creator>Add author: Ismeth Abidin, examiner</creator><creator>Add author: Wisnu Isvara, examiner</creator><creator>Add author: Agus Subiyakto, examiner</creator><publisher/><date>2011</date><subject>Project final Cost Performance</subject><description>[<b>ABSTRAK</b><br>
Kesuksesan suatu proyek konstruksi, salah satunya diperoleh dari pengendalian
biaya pekerjaan temporary. Pengendalian ini dapat berpengaruh pada kinerja
biaya akhir proyek. Penelitian ini bertujuan untuk mengetahui seberapa jauh
pengaruh biaya pekerjaan temporary terhadap kinerja biaya akhir proyek.
Pekerjaan temporary dapat digolongkan menjadi tiga yaitu : Common Temporary
work, Direct Temporary work dan Site Expenses. Penelitian dikhususkan pada
bangunan pabrik yang dikerjakan oleh PT.X. Pengolahan data dilakukan dengan
menggunakan metode deskriptive exploration, yaitu hasil survey berupa kuesioner
dan wawancara dari pakar dan responden. Hasil dari penelitian ini adalah untuk
mengetahui variabel variabel dalam pekerjaan temporary yang paling berpengaruh
terhadap kinerja biaya akhir proyek.
<hr>
<b>ABSTRACT</b><br>
The success of a construction project, one of which is obtained from temporary
work cost control. This control can affect the performance of the final cost of the
project. This study aims to determine how much influence the cost of temporary
works on the performance of the final cost of the project. Temporary works can be
classified into three namely: Common Temporary Work, Direct Temporary Work
and Site Expenses. Specialized research on a factory building which was done by
PT.X. Data processing is done by using descriptive exploration method, namely a
questionnaire survey and interviews of experts and respondents. The results of this
study was to determine the temporary variables in the work of the most influential
on the performance of the final cost of the project., The success of a construction project, one of which is obtained from temporary
work cost control. This control can affect the performance of the final cost of the
project. This study aims to determine how much influence the cost of temporary
works on the performance of the final cost of the project. Temporary works can be
classified into three namely: Common Temporary Work, Direct Temporary Work
and Site Expenses. Specialized research on a factory building which was done by
PT.X. Data processing is done by using descriptive exploration method, namely a
questionnaire survey and interviews of experts and respondents. The results of this
study was to determine the temporary variables in the work of the most influential
on the performance of the final cost of the project.]</description><identifier>https://lib.ui.ac.id/detail?id=20305444</identifier><recordID>20305444</recordID></dc>
|
format |
Thesis:Masters Thesis Thesis:Doctoral |
author |
Arief Hendratno, author Add author: Yusuf Latief, supervisor Add author: Asiyanto, supervisor Add author: Krisna Mochtar, examiner Add author: Ismeth Abidin, examiner Add author: Wisnu Isvara, examiner Add author: Agus Subiyakto, examiner |
title |
Pengaruh Biaya Pekerjaan Temporary Terhadap Kinerja Biaya Akhir Proyek Pada Pembangunan Gedung Pabrik Di PT. X = Effect of temporary work to final cost performance project at building factory in PT X |
publishDate |
2011 |
topic |
Project final Cost Performance |
url |
https://lib.ui.ac.id/detail?id=20305444 |
contents |
[<b>ABSTRAK</b><br>
Kesuksesan suatu proyek konstruksi, salah satunya diperoleh dari pengendalian
biaya pekerjaan temporary. Pengendalian ini dapat berpengaruh pada kinerja
biaya akhir proyek. Penelitian ini bertujuan untuk mengetahui seberapa jauh
pengaruh biaya pekerjaan temporary terhadap kinerja biaya akhir proyek.
Pekerjaan temporary dapat digolongkan menjadi tiga yaitu : Common Temporary
work, Direct Temporary work dan Site Expenses. Penelitian dikhususkan pada
bangunan pabrik yang dikerjakan oleh PT.X. Pengolahan data dilakukan dengan
menggunakan metode deskriptive exploration, yaitu hasil survey berupa kuesioner
dan wawancara dari pakar dan responden. Hasil dari penelitian ini adalah untuk
mengetahui variabel variabel dalam pekerjaan temporary yang paling berpengaruh
terhadap kinerja biaya akhir proyek.
<hr>
<b>ABSTRACT</b><br>
The success of a construction project, one of which is obtained from temporary
work cost control. This control can affect the performance of the final cost of the
project. This study aims to determine how much influence the cost of temporary
works on the performance of the final cost of the project. Temporary works can be
classified into three namely: Common Temporary Work, Direct Temporary Work
and Site Expenses. Specialized research on a factory building which was done by
PT.X. Data processing is done by using descriptive exploration method, namely a
questionnaire survey and interviews of experts and respondents. The results of this
study was to determine the temporary variables in the work of the most influential
on the performance of the final cost of the project., The success of a construction project, one of which is obtained from temporary
work cost control. This control can affect the performance of the final cost of the
project. This study aims to determine how much influence the cost of temporary
works on the performance of the final cost of the project. Temporary works can be
classified into three namely: Common Temporary Work, Direct Temporary Work
and Site Expenses. Specialized research on a factory building which was done by
PT.X. Data processing is done by using descriptive exploration method, namely a
questionnaire survey and interviews of experts and respondents. The results of this
study was to determine the temporary variables in the work of the most influential
on the performance of the final cost of the project.] |
id |
IOS18068.20305444 |
institution |
Universitas Indonesia |
institution_id |
51 |
institution_type |
library:university library |
library |
Perpustakaan Universitas Indonesia |
library_id |
492 |
collection |
Repository Disertasi (Membership) Universitas Indonesia |
repository_id |
18068 |
city |
KOTA DEPOK |
province |
JAWA BARAT |
repoId |
IOS18068 |
first_indexed |
2022-12-14T04:11:48Z |
last_indexed |
2022-12-14T04:11:48Z |
recordtype |
dc |
merged_child_boolean |
1 |
_version_ |
1752197873630445568 |
score |
17.610468 |