Analisa konstruksi jembatan cable stayed menggunakan metode Kantilever studi kasus Jembatan Suramadu = Analysis of cable stayed

Main Authors: Irpan Hidayat, author, Add author: Heru Purnomo, supervisor, Add author: Sjahril A. Rahim, supervisor, Add author: Josia Irwan Rastandi, examiner, Add author: Elly Tjahjono, examiner, Add author: Essy Arijoeni Basoenondo, examiner
Format: Masters Thesis
Terbitan: Fakultas Teknik Universitas Indonesia , 2011
Subjects:
Online Access: https://lib.ui.ac.id/detail?id=20293852
ctrlnum 20293852
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><type>Thesis:Masters</type><title>Analisa konstruksi jembatan cable stayed menggunakan metode Kantilever : studi kasus Jembatan Suramadu = Analysis of cable stayed</title><creator>Irpan Hidayat, author</creator><creator>Add author: Heru Purnomo, supervisor</creator><creator>Add author: Sjahril A. Rahim, supervisor</creator><creator>Add author: Josia Irwan Rastandi, examiner</creator><creator>Add author: Elly Tjahjono, examiner</creator><creator>Add author: Essy Arijoeni Basoenondo, examiner</creator><publisher>Fakultas Teknik Universitas Indonesia</publisher><date>2011</date><subject>Cable-stayed bridges</subject><description>[&lt;b&gt;ABSTRAK&lt;/b&gt;&lt;&gt;br&gt; Tesis ini membahas mengenai perhitungan pembangunan secara bertahap berdasarkan ketergantungan waktu (time dependent) jembatan cable stayed dengan studi kasus Jembatan Suramadu. Adapun hasil yang akan diperoleh pada penelitian ini yaitu mengevaluasi perilaku struktur pada saat pelaksanaan bertahap menggunakan metode kantilever seperti besarnya gaya-gaya kabel, tegangan elemen struktur, dan lendutan gelagar yang terjadi pada setiap tahapan konstruksi. Teknik analisa yang digunakan yaitu forward assemblage analysis dan backward disassemblage analysis. Dimana untuk teknik menggunakan forward assemblage analysis pelat dimodelkan sebagai non komposit dan komposit serta menggunakan standar CEB-FIP dan ACI untuk mengetahui seberapa pengaruh nilai lendutan kedua standar tersebut. Dari hasil penelitian diperoleh bahwa terjadi penurunan besaran lendutan gelagar sebesar 19 % dan gaya kabel sebesar 22 % setelah 10 hari pengecoran pelat dilakukan (sudah terjadi efek struktur komposit), dari asumsi pelat dimodelkan sebagai beban luar menjadi pemodelan struktur komposit. Dengan menggunakan standar CEB-FIP dan ACI diperoleh hasil bahwa nilai lendutan pada awal penempatan pelat (sudah terjadi struktur yang komposit) lebih kecil jika menggunakan code ACI. Hal ini disebabkan karena efek ACI pada awal terjadi struktur yang komposit memberikan nilai efek kekuatan material yang lebih besar dibandingkan dengan CEB-FIP. Sedangkan pada akhir-akhir pelaksanaan konstruksi nilai lendutan gelagar menggunakan CEB-FIP memperoleh hasil yang cenderung lebih kecil dibandingkan dengan ACI. Hasil perbandingan analisa antara forward assemblage analysis dan backward disassemblage analysis menggambarkan bahwa untuk nilai lendutan gelagar, terjadi perbedaan hasil rata-rata sebesar 3 % sedangkan untuk nilai gaya kabel terjadi variasi perbedaan antara 1 ? 4 % &lt;hr&gt; &lt;b&gt;Abstract&lt;/b&gt;&lt;br&gt; This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.;This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.;This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.;This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.;This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.;This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %., This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.]</description><identifier>https://lib.ui.ac.id/detail?id=20293852</identifier><recordID>20293852</recordID></dc>
format Thesis:Masters
Thesis
Thesis:Thesis
author Irpan Hidayat, author
Add author: Heru Purnomo, supervisor
Add author: Sjahril A. Rahim, supervisor
Add author: Josia Irwan Rastandi, examiner
Add author: Elly Tjahjono, examiner
Add author: Essy Arijoeni Basoenondo, examiner
title Analisa konstruksi jembatan cable stayed menggunakan metode Kantilever : studi kasus Jembatan Suramadu = Analysis of cable stayed
title_sub studi kasus Jembatan Suramadu = Analysis of cable stayed
publisher Fakultas Teknik Universitas Indonesia
publishDate 2011
topic Cable-stayed bridges
url https://lib.ui.ac.id/detail?id=20293852
contents [<b>ABSTRAK</b><>br> Tesis ini membahas mengenai perhitungan pembangunan secara bertahap berdasarkan ketergantungan waktu (time dependent) jembatan cable stayed dengan studi kasus Jembatan Suramadu. Adapun hasil yang akan diperoleh pada penelitian ini yaitu mengevaluasi perilaku struktur pada saat pelaksanaan bertahap menggunakan metode kantilever seperti besarnya gaya-gaya kabel, tegangan elemen struktur, dan lendutan gelagar yang terjadi pada setiap tahapan konstruksi. Teknik analisa yang digunakan yaitu forward assemblage analysis dan backward disassemblage analysis. Dimana untuk teknik menggunakan forward assemblage analysis pelat dimodelkan sebagai non komposit dan komposit serta menggunakan standar CEB-FIP dan ACI untuk mengetahui seberapa pengaruh nilai lendutan kedua standar tersebut. Dari hasil penelitian diperoleh bahwa terjadi penurunan besaran lendutan gelagar sebesar 19 % dan gaya kabel sebesar 22 % setelah 10 hari pengecoran pelat dilakukan (sudah terjadi efek struktur komposit), dari asumsi pelat dimodelkan sebagai beban luar menjadi pemodelan struktur komposit. Dengan menggunakan standar CEB-FIP dan ACI diperoleh hasil bahwa nilai lendutan pada awal penempatan pelat (sudah terjadi struktur yang komposit) lebih kecil jika menggunakan code ACI. Hal ini disebabkan karena efek ACI pada awal terjadi struktur yang komposit memberikan nilai efek kekuatan material yang lebih besar dibandingkan dengan CEB-FIP. Sedangkan pada akhir-akhir pelaksanaan konstruksi nilai lendutan gelagar menggunakan CEB-FIP memperoleh hasil yang cenderung lebih kecil dibandingkan dengan ACI. Hasil perbandingan analisa antara forward assemblage analysis dan backward disassemblage analysis menggambarkan bahwa untuk nilai lendutan gelagar, terjadi perbedaan hasil rata-rata sebesar 3 % sedangkan untuk nilai gaya kabel terjadi variasi perbedaan antara 1 ? 4 % <hr> <b>Abstract</b><br> This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.;This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.;This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.;This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.;This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.;This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %., This thesis discuss the construction calculation in stages based on the dependence of time (time dependent) cable stayed bridge, using Suramadu Bridge as a case study. Results that will be obtained in this study are to evaluate the behavior of structures during the implementation stages by using cantilever method such as the cable forces, tension structural element, and girder deflection that occurs in each stage of construction. The analysis technique that used in this thesis are the forward assemblage analysis and backward disassemblage analysis. Where the forward assemblage analysis technique modeled the plate as a non-composite and composite form by using CEB-FIP and ACI standards to determine the influence of the deflection. The result showed that there are decreasing deflection around 19% and cable force by 22% after 10 days of casting plate done (already in composite structure), from the assumption, the plate is modeled as external loads into composite structures model. By using standard CEB-FIP and ACI showed the value of deflection in initial placement of the plate (in composite structure) is smaller when using the ACI code. This is because the effect of ACI in the early composite structure gives the material strength in a greater value than the CEB-FIP. In contrary, at the end of the construction stages, the girder deflection that using CEB-FIP gives smaller deflection compared to ACI. The comparison analysis between the forward assemblage analysis and disassemblage analysis illustrates that there was an average difference of 3 % while for the cable force variations the differences are between 1 ? 4 %.]
id IOS18070.20293852
institution Universitas Indonesia
institution_id 51
institution_type library:university
library
library Perpustakaan Universitas Indonesia
library_id 492
collection Repository Tugas Akhir Universitas Indonesia
repository_id 18070
city KOTA DEPOK
province JAWA BARAT
repoId IOS18070
first_indexed 2022-12-14T06:14:41Z
last_indexed 2022-12-14T06:14:41Z
recordtype dc
merged_child_boolean 1
_version_ 1752195799704403968
score 17.610468