Penentuan Letak dan Kapasitas Optimal Bank Kapasitor pada Jaring Transmisi 150 kV Sumatera Utara Menggunakan Artificial Bee Colony Algorithm
Main Authors: | Shafira, Andita Noor; Jurusan Teknik Elektro, Fakultas Teknologi Industri, Institut Teknologi Sepuluh Nopember, Soeprijanto, Adi; Jurusan Teknik Elektro, Fakultas Teknologi Industri, Institut Teknologi Sepuluh Nopember, Anam, Sjamsul; Jurusan Teknik Elektro, Fakultas Teknologi Industri, Institut Teknologi Sepuluh Nopember |
---|---|
Format: | Article info application/pdf eJournal |
Bahasa: | eng |
Terbitan: |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat (LPPM), ITS
, 2017
|
Subjects: | |
Online Access: |
http://ejurnal.its.ac.id/index.php/teknik/article/view/17347 http://ejurnal.its.ac.id/index.php/teknik/article/view/17347/2934 |
ctrlnum |
article-17347 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="en-US">Penentuan Letak dan Kapasitas Optimal Bank Kapasitor pada Jaring Transmisi 150 kV Sumatera Utara Menggunakan Artificial Bee Colony Algorithm</title><creator>Shafira, Andita Noor; Jurusan Teknik Elektro, Fakultas Teknologi Industri, Institut Teknologi Sepuluh Nopember</creator><creator>Soeprijanto, Adi; Jurusan Teknik Elektro, Fakultas Teknologi Industri, Institut Teknologi Sepuluh Nopember</creator><creator>Anam, Sjamsul; Jurusan Teknik Elektro, Fakultas Teknologi Industri, Institut Teknologi Sepuluh Nopember</creator><subject lang="en-US">Teknik Elektro</subject><subject lang="en-US">Aliran Daya Reaktif; Artificial Bee Colony Algorithm; Kapasitor</subject><description lang="en-US">Listrik merupakan suatu kebutuhan mutlak yang harus dipenuhi untuk menjamin keberlangsungan hidup masyarakat masa kini. Kebutuhan ini terus meningkat seiring dengan pertumbuhan beban yang semakin bertambah dari tahun ke tahun. Pertumbuhan beban yang diikuti dengan peningkatan permintaan suplai daya reaktif akibat beban bersifat induktif meningkat menyebabkan perencanaan dan operasi dari sistem interkoneksi menjadi lebih kompleks sehingga kualitas sistem menjadi kurang dapat diandalkan. Aliran daya reaktif dapat menyebabkan drop tegangan dan kerugian daya dalam sistem transmisi. Untuk itu dilakukan penentuan letak dan kapasitas kapasitor shunt untuk mengurangi kerugian daya dengan menggunakan Newton-Raphson dan metode optimisasi Artificial Bee Colony Algorithm. Pada percobaan ini dilakukan pemasangan lima kapasitor dengan jumlah koloni sebesar 50 dan Max Cycle Number sebesar 150. Hasil simulasi menggunakan metode Artificial Bee Colony Algorithm menunjukkan bahwa pemasangan kapasitor pada Jaring Transmisi 150 kV Sumatera Utara dapat menurunkan kerugian daya aktif sebesar 8,37%.</description><publisher lang="en-US">Lembaga Penelitian dan Pengabdian Kepada Masyarakat (LPPM), ITS</publisher><date>2017-01-08</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>File:application/pdf</type><identifier>http://ejurnal.its.ac.id/index.php/teknik/article/view/17347</identifier><source lang="en-US">Jurnal Teknik ITS; Vol 5, No 2 (2016); A750-A757</source><language>eng</language><relation>http://ejurnal.its.ac.id/index.php/teknik/article/view/17347/2934</relation><rights>Authors who publish with this journal agree to the following terms: Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).</rights><recordID>article-17347</recordID></dc>
|
language |
eng |
format |
Journal:Article Journal Other:info:eu-repo/semantics/publishedVersion Other File:application/pdf File Journal:eJournal |
author |
Shafira, Andita Noor; Jurusan Teknik Elektro, Fakultas Teknologi Industri, Institut Teknologi Sepuluh Nopember Soeprijanto, Adi; Jurusan Teknik Elektro, Fakultas Teknologi Industri, Institut Teknologi Sepuluh Nopember Anam, Sjamsul; Jurusan Teknik Elektro, Fakultas Teknologi Industri, Institut Teknologi Sepuluh Nopember |
title |
Penentuan Letak dan Kapasitas Optimal Bank Kapasitor pada Jaring Transmisi 150 kV Sumatera Utara Menggunakan Artificial Bee Colony Algorithm |
publisher |
Lembaga Penelitian dan Pengabdian Kepada Masyarakat (LPPM), ITS |
publishDate |
2017 |
topic |
Teknik Elektro Aliran Daya Reaktif Artificial Bee Colony Algorithm Kapasitor |
url |
http://ejurnal.its.ac.id/index.php/teknik/article/view/17347 http://ejurnal.its.ac.id/index.php/teknik/article/view/17347/2934 |
contents |
Listrik merupakan suatu kebutuhan mutlak yang harus dipenuhi untuk menjamin keberlangsungan hidup masyarakat masa kini. Kebutuhan ini terus meningkat seiring dengan pertumbuhan beban yang semakin bertambah dari tahun ke tahun. Pertumbuhan beban yang diikuti dengan peningkatan permintaan suplai daya reaktif akibat beban bersifat induktif meningkat menyebabkan perencanaan dan operasi dari sistem interkoneksi menjadi lebih kompleks sehingga kualitas sistem menjadi kurang dapat diandalkan. Aliran daya reaktif dapat menyebabkan drop tegangan dan kerugian daya dalam sistem transmisi. Untuk itu dilakukan penentuan letak dan kapasitas kapasitor shunt untuk mengurangi kerugian daya dengan menggunakan Newton-Raphson dan metode optimisasi Artificial Bee Colony Algorithm. Pada percobaan ini dilakukan pemasangan lima kapasitor dengan jumlah koloni sebesar 50 dan Max Cycle Number sebesar 150. Hasil simulasi menggunakan metode Artificial Bee Colony Algorithm menunjukkan bahwa pemasangan kapasitor pada Jaring Transmisi 150 kV Sumatera Utara dapat menurunkan kerugian daya aktif sebesar 8,37%. |
id |
IOS2038.article-17347 |
institution |
Institut Teknologi Sepuluh November |
institution_id |
196 |
institution_type |
library:university library |
library |
Perpustakaan Institut Teknologi Sepuluh November |
library_id |
104 |
collection |
Jurnal Teknik ITS |
repository_id |
2038 |
city |
KOTA SURABAYA |
province |
JAWA TIMUR |
repoId |
IOS2038 |
first_indexed |
2017-02-25T13:48:48Z |
last_indexed |
2017-02-25T13:48:48Z |
recordtype |
dc |
_version_ |
1685754217033105408 |
score |
17.610363 |