STUDI PEMBENTUKAN ZONE JARINGAN PIPA DISTRIBUSI AIR MINUM KOTA SEMARANG (Wilayah pelayanan PDAM SEMARANG UTARA )

Main Authors: Nasrullah,, Nasrullah, Arief Budihardjo, Mochamad
Format: Article info application/pdf eJournal
Bahasa: eng
Terbitan: Fakultas Teknik, Universitas Diponegoro , 2012
Subjects:
Online Access: http://ejournal.undip.ac.id/index.php/teknik/article/view/2073
http://ejournal.undip.ac.id/index.php/teknik/article/view/2073/1824
ctrlnum article-2073
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="en-US">STUDI PEMBENTUKAN ZONE JARINGAN PIPA DISTRIBUSI AIR MINUM KOTA SEMARANG (Wilayah pelayanan PDAM SEMARANG UTARA )</title><creator>Nasrullah,, Nasrullah</creator><creator>Arief Budihardjo, Mochamad</creator><subject lang="en-US">zone, pressure, distribution pipe network</subject><description lang="en-US">Semarang City&amp;rsquo;s drinking water distribution system in the North Semarang uses an interconnectionnetwork system. This causes difficulty in optimizing the network distribution supply and controlling thewater leakage. Semarang City&amp;rsquo;s drinking water provider is planning to divide the area in to 25 zones. Thisstudy purpose to plan one of the zone areas, which is zone 1. The existing condition on zone 1 shows thatthe water source is from Siranda distribution reservoir. The water flows by the gravitation. The distributionpressure on the pipe network is not even. Pressure drop between 3 to 7 m water columns at the peakcondition on the end of the furthest point in the network. The strategy in planning the network is by cuttingthe interconnection pipe, providing new pipes, closing the existing valves, adding new valves for isolatedareas, adding primary water meter and sub zone water meter and moving the interconnection pipes. Then,the distribution system is analyzed using Epanet 2.0 program that can show the effort of the changes after.The system shows that there is no more pressure drop on the area. The pressures are between 11-16 meterwater column and the water flow in the pipes are more alike, between 0,3 to 3 m/s. The PDAM can observethe distribution and the water leak more easily by using this system.</description><publisher lang="en-US">Fakultas Teknik, Universitas Diponegoro</publisher><date>2012-02-10</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>File:application/pdf</type><identifier>http://ejournal.undip.ac.id/index.php/teknik/article/view/2073</identifier><identifier>10.14710/teknik.v28i1.2073</identifier><source lang="en-US">Teknik; Volume 28, Nomor 1, Tahun 2007; 27-33</source><language>eng</language><relation>http://ejournal.undip.ac.id/index.php/teknik/article/view/2073/1824</relation><rights>The Authors submitting a manuscript do so on the understanding that if accepted for publication, copyright of the article shall be assigned to jurnal TEKNIK and Faculty of Engineering, Diponegoro University as publisher of the journal.</rights><recordID>article-2073</recordID></dc>
language eng
format Journal:Article
Journal
Other:info:eu-repo/semantics/publishedVersion
Other
File:application/pdf
File
Journal:eJournal
author Nasrullah,, Nasrullah
Arief Budihardjo, Mochamad
title STUDI PEMBENTUKAN ZONE JARINGAN PIPA DISTRIBUSI AIR MINUM KOTA SEMARANG (Wilayah pelayanan PDAM SEMARANG UTARA )
publisher Fakultas Teknik, Universitas Diponegoro
publishDate 2012
topic zone
pressure
distribution pipe network
url http://ejournal.undip.ac.id/index.php/teknik/article/view/2073
http://ejournal.undip.ac.id/index.php/teknik/article/view/2073/1824
contents Semarang City&rsquo;s drinking water distribution system in the North Semarang uses an interconnectionnetwork system. This causes difficulty in optimizing the network distribution supply and controlling thewater leakage. Semarang City&rsquo;s drinking water provider is planning to divide the area in to 25 zones. Thisstudy purpose to plan one of the zone areas, which is zone 1. The existing condition on zone 1 shows thatthe water source is from Siranda distribution reservoir. The water flows by the gravitation. The distributionpressure on the pipe network is not even. Pressure drop between 3 to 7 m water columns at the peakcondition on the end of the furthest point in the network. The strategy in planning the network is by cuttingthe interconnection pipe, providing new pipes, closing the existing valves, adding new valves for isolatedareas, adding primary water meter and sub zone water meter and moving the interconnection pipes. Then,the distribution system is analyzed using Epanet 2.0 program that can show the effort of the changes after.The system shows that there is no more pressure drop on the area. The pressures are between 11-16 meterwater column and the water flow in the pipes are more alike, between 0,3 to 3 m/s. The PDAM can observethe distribution and the water leak more easily by using this system.
id IOS2695.article-2073
institution Universitas Diponegoro
institution_id 69
institution_type library:university
library
library Perpustakaan Universitas Diponegoro
library_id 485
collection TEKNIK
repository_id 2695
subject_area Arsitektur
Fisika
Program Komputer dan Teknologi Informasi