PERANCANGAN MAXIMUM POWER POINT TRACKING PADA PEMBANGKIT LISTRIK TENAGA BAYU MENGGUNAKAN FOUR SWITCH BUCK BOOST CONVERTER DENGAN METODE P&O-ORB
Main Authors: | effendy, machmud, Syahputra, Rosyadi Nur, hidayat, khusnul |
---|---|
Other Authors: | Universitas Muhammadiyah Malang |
Format: | Article info application/pdf eJournal |
Bahasa: | ind |
Terbitan: |
Departemen Teknik Elektro, Universitas Diponegoro
, 2019
|
Subjects: | |
Online Access: |
https://ejournal.undip.ac.id/index.php/transmisi/article/view/24257 https://ejournal.undip.ac.id/index.php/transmisi/article/view/24257/pdf |
ctrlnum |
article-24257 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="id-ID">PERANCANGAN MAXIMUM POWER POINT TRACKING PADA PEMBANGKIT LISTRIK TENAGA BAYU MENGGUNAKAN FOUR SWITCH BUCK BOOST CONVERTER DENGAN METODE P&O-ORB</title><creator>effendy, machmud</creator><creator>Syahputra, Rosyadi Nur</creator><creator>hidayat, khusnul</creator><subject lang="id-ID">teknik elektro,elektronika daya,energi terbarukan</subject><subject lang="id-ID">MPPT, P&O, ORB, Four Switch Buck Boost</subject><description lang="id-ID">MPPT (maximum power point tracking) merupakan cara untuk memaksimalkan daya keluaran pada pembangkit listrik tenaga bayu (PLTB). Sistem MPPT pada PLTB terdiri dari DC-DC converter dan metode kontrol. Pada penelitian ini, sistem MPPT menggunakan Four Switch Buck Boost (FSBB) converter, dimana converter ini memiliki polaritas tegangan yang sama antara input dan output, ripple tegangan rendah, dan efisiensi daya lebih besar dibandingkan dengan Buck Boost Converter. Metode kontrol yang digunakan adalah  Perturb and Observe (P&O)- ORB (Optimum Relations-Based) yang memiliki tingkat osilasi lebih rendah dan efisiensi lebih tinggi dibandingkan dengan metode P&O.Sistem MPPT disimulasikan menggunakan software PSIM untuk mengetahui performa P&O-ORB dan FSBB converter. Evaluasi kinerja  P&O-ORB dan FSBB diuji dalam kondisi kecepatan angin 5 m/s. Hasil simulasi menunjukkan FSBB memiliki tingkat kesalahan yang lebih kecil daripada Buck Boost yaitu 0,02%. Dan sistem MPPT dengan metode P&O-ORB memiliki tingkat efisiensi yang tinggi mencapai 98,01 %.</description><publisher lang="id-ID">Departemen Teknik Elektro, Universitas Diponegoro</publisher><contributor lang="id-ID">Universitas Muhammadiyah Malang</contributor><date>2019-10-29</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Other:</type><type>Journal:Article</type><type>File:application/pdf</type><identifier>https://ejournal.undip.ac.id/index.php/transmisi/article/view/24257</identifier><identifier>10.14710/transmisi.21.4.%p</identifier><source lang="en-US">TRANSMISI; Vol 21, No 4 Oktober (2019): TRANSMISI; 96-102</source><source lang="id-ID">Transmisi; Vol 21, No 4 Oktober (2019): TRANSMISI; 96-102</source><source>2407-6422</source><source>1411-0814</source><language>ind</language><relation>https://ejournal.undip.ac.id/index.php/transmisi/article/view/24257/pdf</relation><rights lang="id-ID">Copyright (c) 2019 Transmisi</rights><rights lang="id-ID">http://creativecommons.org/licenses/by-sa/4.0</rights><recordID>article-24257</recordID></dc>
|
language |
ind |
format |
Journal:Article Journal Other:info:eu-repo/semantics/publishedVersion Other Other: File:application/pdf File Journal:eJournal |
author |
effendy, machmud Syahputra, Rosyadi Nur hidayat, khusnul |
author2 |
Universitas Muhammadiyah Malang |
title |
PERANCANGAN MAXIMUM POWER POINT TRACKING PADA PEMBANGKIT LISTRIK TENAGA BAYU MENGGUNAKAN FOUR SWITCH BUCK BOOST CONVERTER DENGAN METODE P&O-ORB |
publisher |
Departemen Teknik Elektro, Universitas Diponegoro |
publishDate |
2019 |
topic |
teknik elektro elektronika daya energi terbarukan MPPT P&O ORB Four Switch Buck Boost |
url |
https://ejournal.undip.ac.id/index.php/transmisi/article/view/24257 https://ejournal.undip.ac.id/index.php/transmisi/article/view/24257/pdf |
contents |
MPPT (maximum power point tracking) merupakan cara untuk memaksimalkan daya keluaran pada pembangkit listrik tenaga bayu (PLTB). Sistem MPPT pada PLTB terdiri dari DC-DC converter dan metode kontrol. Pada penelitian ini, sistem MPPT menggunakan Four Switch Buck Boost (FSBB) converter, dimana converter ini memiliki polaritas tegangan yang sama antara input dan output, ripple tegangan rendah, dan efisiensi daya lebih besar dibandingkan dengan Buck Boost Converter. Metode kontrol yang digunakan adalah Perturb and Observe (P&O)- ORB (Optimum Relations-Based) yang memiliki tingkat osilasi lebih rendah dan efisiensi lebih tinggi dibandingkan dengan metode P&O.Sistem MPPT disimulasikan menggunakan software PSIM untuk mengetahui performa P&O-ORB dan FSBB converter. Evaluasi kinerja P&O-ORB dan FSBB diuji dalam kondisi kecepatan angin 5 m/s. Hasil simulasi menunjukkan FSBB memiliki tingkat kesalahan yang lebih kecil daripada Buck Boost yaitu 0,02%. Dan sistem MPPT dengan metode P&O-ORB memiliki tingkat efisiensi yang tinggi mencapai 98,01 %. |
id |
IOS2698.article-24257 |
institution |
Universitas Diponegoro |
institution_id |
69 |
institution_type |
library:university library |
library |
Perpustakaan Universitas Diponegoro |
library_id |
485 |
collection |
TRANSMISI |
repository_id |
2698 |
subject_area |
Communications Telemunications/Komunikasi Telekomunikasi Data Transmission Modes and Data Switching Methods/Metode Transmisi Data |
city |
SEMARANG |
province |
JAWA TENGAH |
repoId |
IOS2698 |
first_indexed |
2019-11-02T15:46:43Z |
last_indexed |
2020-01-03T00:24:07Z |
recordtype |
dc |
_version_ |
1685812241118527488 |
score |
17.612425 |