PERENCANAAN EMBUNG POIGAR 3 DI KABUPATEN BOLAANG MONGONDOW PROVINSI SULAWESI UTARA
Main Author: | Ratnasari, Putri |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2018
|
Subjects: | |
Online Access: |
http://eprints.umm.ac.id/43601/1/PENDAHULUAN.pdf http://eprints.umm.ac.id/43601/2/BAB%20I.pdf http://eprints.umm.ac.id/43601/3/BAB%20II.pdf http://eprints.umm.ac.id/43601/4/BAB%20III.pdf http://eprints.umm.ac.id/43601/5/BAB%20IV.pdf http://eprints.umm.ac.id/43601/6/BAB%20V.pdf http://eprints.umm.ac.id/43601/7/LAMPIRAN.pdf http://eprints.umm.ac.id/43601/ |
Daftar Isi:
- Due to the scarcity of water resources, an effort is needed to meet these water needs.To fulfil the need of 2,52 1/det and 2,05 1/det/ha water in Bolaang Mongondow Regency – North Sulawesi, a construction of Poigar 3 retention basin was planned. Through the NRECA method, the analysis results showed that the dependable flow was 0,1493 million m3/year. To design the basin and the spillway, the researcher used the hydrology data of flood discharge, the HSS Nakayasu method with the 50-years flood discharge plan in the amount of 1,925 m3/det, and the routing that resulted in the amount of 1,417 m3/det. The basin’s maximum storage capacity was 9.702,43 m3. Meanwhile, both of the spillway’s height the spillway threshold’s width was 6 metre.