Analysis of Overall Equipment Effectiveness in Fanuc Line 1 Machines by Minimizing six big losses

Main Authors: Sukanta, N., Burhan, Setiawan, Sari, Dessy Agustina
Format: Article info application/pdf eJournal
Bahasa: eng
Terbitan: Fakultas Teknik Universitas Sam Ratulangi , 2019
Subjects:
OEE
Online Access: http://seps.unsrat.ac.id/journals/index.php/joseps/article/view/22
http://seps.unsrat.ac.id/journals/index.php/joseps/article/view/22/21
ctrlnum article-22
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="en-US">Analysis of Overall Equipment Effectiveness in Fanuc Line 1 Machines by Minimizing six big losses</title><creator>Sukanta</creator><creator>N., Burhan</creator><creator>Setiawan</creator><creator>Sari, Dessy Agustina</creator><subject lang="en-US">OEE</subject><subject lang="en-US">Six Big Losses</subject><subject lang="en-US">Effectiveness</subject><subject lang="en-US">Cause and Effect Diagram</subject><description lang="en-US">The company produces several automotive components in Karawang. For the production process using Fanuc machines on Line1, but the results of evaluating the performance of the engine Fanuc Line1 engine effectiveness is not optimal. It was alleged that due to the planning and maintenance of the management machinery was not good, so that the frequency of damage to the machine was still high, which gave the effect that the production was not achieved. For this reason, the effectiveness of the use of Fanuc line1 is done by using the Overall Equipment Effectiveness (OEE) method with the Six big losses calculation approach so that the level of efficiency can be known. The results showed that the magnitude of the OEE value on Fanuc line1 machines in April &#x2013; August 2018 amounted to 78.82%, this value is still below the JIPM standard of 85%. The amount of Losses is influenced by reduced speed loss of 57.47% and breakdown loss of 22.79%.</description><publisher lang="en-US">Fakultas Teknik Universitas Sam Ratulangi</publisher><date>2019-09-30</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Journal:Article</type><type>File:application/pdf</type><identifier>http://seps.unsrat.ac.id/journals/index.php/joseps/article/view/22</identifier><identifier>10.35793/joseps.v1i2.22</identifier><source lang="en-US">Journal of Sustainable Engineering: Proceedings Series; Vol 1 No 2 (2019); 164-173</source><source>2685-8762</source><source>10.35793/joseps.v1i2</source><language>eng</language><relation>http://seps.unsrat.ac.id/journals/index.php/joseps/article/view/22/21</relation><rights lang="en-US">Copyright (c) 2019 Sukanta, Burhan N., Setiawan, Dessy Agustina Sari</rights><rights lang="en-US">https://creativecommons.org/licenses/by/4.0</rights><recordID>article-22</recordID></dc>
language eng
format Journal:Article
Journal
Other:info:eu-repo/semantics/publishedVersion
Other
File:application/pdf
File
Journal:eJournal
author Sukanta
N., Burhan
Setiawan
Sari, Dessy Agustina
title Analysis of Overall Equipment Effectiveness in Fanuc Line 1 Machines by Minimizing six big losses
publisher Fakultas Teknik Universitas Sam Ratulangi
publishDate 2019
topic OEE
Six Big Losses
Effectiveness
Cause and Effect Diagram
url http://seps.unsrat.ac.id/journals/index.php/joseps/article/view/22
http://seps.unsrat.ac.id/journals/index.php/joseps/article/view/22/21
contents The company produces several automotive components in Karawang. For the production process using Fanuc machines on Line1, but the results of evaluating the performance of the engine Fanuc Line1 engine effectiveness is not optimal. It was alleged that due to the planning and maintenance of the management machinery was not good, so that the frequency of damage to the machine was still high, which gave the effect that the production was not achieved. For this reason, the effectiveness of the use of Fanuc line1 is done by using the Overall Equipment Effectiveness (OEE) method with the Six big losses calculation approach so that the level of efficiency can be known. The results showed that the magnitude of the OEE value on Fanuc line1 machines in April – August 2018 amounted to 78.82%, this value is still below the JIPM standard of 85%. The amount of Losses is influenced by reduced speed loss of 57.47% and breakdown loss of 22.79%.
id IOS7956.article-22
institution Universitas Sam Ratulangi
institution_id 22
institution_type library:university
library
library Perpustakaan Universitas Sam Ratulangi
library_id 591
collection Journal of Sustainable Engineering: Proceedings Series
repository_id 7956
subject_area Civil and Environmental Engineering
Architecture and Urban Planning
Electrical Engineering and Informatics
Mechanical and Industrial Engineering
city KOTA MANADO
province SULAWESI UTARA
shared_to_ipusnas_str 1
repoId IOS7956
first_indexed 2020-03-31T06:22:50Z
last_indexed 2020-03-31T06:22:50Z
recordtype dc
merged_child_boolean 1
_version_ 1686586538075357184
score 17.20178