Timetable Creation of BRT Transmusi by Using Branch and Bound Method (Conference)

Main Authors: Irmeilyana, Irmeilyana, Indrawati, Indrawati, Utari, Amelia
Format: Proceeding NonPeerReviewed Book
Bahasa: eng
Subjects:
Online Access: http://repository.unsri.ac.id/22736/1/12.Timetable%20Creation%20of%20BRT%20Transmusi%20-2017.pdf
http://repository.unsri.ac.id/22736/
ctrlnum 22736
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.unsri.ac.id/22736/</relation><title>Timetable Creation of BRT Transmusi by Using &#xD; Branch and Bound Method (Conference)</title><creator>Irmeilyana, Irmeilyana</creator><creator>Indrawati, Indrawati</creator><creator>Utari, Amelia</creator><subject>QA1-43 General</subject><description>Timetable problem of public transportation is &#xD; a problem in scheduling the optimal departure time to &#xD; minimize the density of passengers. Timetable problem is an &#xD; integer programming, so it can be solved by using Branch &#xD; and Bound Method. This study used travel route of BRT &#xD; Transmusi Kota Palembang in July 2016 for Sako - Pasar &#xD; Gubah route and vice versa. The secondary data used are the &#xD; departure schedule, the number of buses operated, and also &#xD; primary data of passengers and the time taken. Based on the &#xD; calculation result of Branch and Bound Method, it can be &#xD; concluded that the total minimum number of passengers &#xD; jostled in both routes is 145 passengers with 10 buses &#xD; operated in 2 hours. Based on the timetable obtained, in the &#xD; first period the number of buses needed on Sako &#x2013; Pasar &#xD; Gubah route are 5 buses with headway for 12 minutes &#xD; headway, whereas Pasar Gubah &#x2013; Sako route needs 6 buses &#xD; with 10 minutes. In the second period, Sako &#x2013; Pasar Gubah &#xD; route needs 6 buses with headway for 10 minutes, whereas &#xD; Pasar Gubah &#x2013; Sako route needs 5 buses with headway for &#xD; 12 minutes.</description><type>Journal:Proceeding</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://repository.unsri.ac.id/22736/1/12.Timetable%20Creation%20of%20BRT%20Transmusi%20-2017.pdf</identifier><identifier> Irmeilyana, Irmeilyana and Indrawati, Indrawati and Utari, Amelia Timetable Creation of BRT Transmusi by Using Branch and Bound Method (Conference). In: ICCMCS, Mei 2016, Langkawi, Malaysia. (Unpublished) </identifier><recordID>22736</recordID></dc>
language eng
format Journal:Proceeding
Journal
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author Irmeilyana, Irmeilyana
Indrawati, Indrawati
Utari, Amelia
title Timetable Creation of BRT Transmusi by Using Branch and Bound Method (Conference)
topic QA1-43 General
url http://repository.unsri.ac.id/22736/1/12.Timetable%20Creation%20of%20BRT%20Transmusi%20-2017.pdf
http://repository.unsri.ac.id/22736/
contents Timetable problem of public transportation is a problem in scheduling the optimal departure time to minimize the density of passengers. Timetable problem is an integer programming, so it can be solved by using Branch and Bound Method. This study used travel route of BRT Transmusi Kota Palembang in July 2016 for Sako - Pasar Gubah route and vice versa. The secondary data used are the departure schedule, the number of buses operated, and also primary data of passengers and the time taken. Based on the calculation result of Branch and Bound Method, it can be concluded that the total minimum number of passengers jostled in both routes is 145 passengers with 10 buses operated in 2 hours. Based on the timetable obtained, in the first period the number of buses needed on Sako – Pasar Gubah route are 5 buses with headway for 12 minutes headway, whereas Pasar Gubah – Sako route needs 6 buses with 10 minutes. In the second period, Sako – Pasar Gubah route needs 6 buses with headway for 10 minutes, whereas Pasar Gubah – Sako route needs 5 buses with headway for 12 minutes.
id IOS8119.22736
institution Universitas Sriwijaya
institution_id 177
institution_type library:university
library
library UPT Perpustakaan Universitas Sriwijaya
library_id 1098
collection Sriwijaya University Institutional Repository
repository_id 8119
city OGAN ILIR
province SUMATERA SELATAN
shared_to_ipusnas_str 1
repoId IOS8119
first_indexed 2020-03-23T08:00:59Z
last_indexed 2020-03-23T08:00:59Z
recordtype dc
_version_ 1684010471656521728
score 17.60899