ctrlnum 24810
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.unsri.ac.id/24810/</relation><title>KAJIAN PRE-FIRE PLANNING PADA TANGKI TIMBUN T-04 TERMINAL BBM PT PERTAMINA MARKETING OPERATION REGION II KERTAPATI SUMBAGSEL</title><creator>MUKHTAR, ARIEF BERLIANTA</creator><creator>Andarini, Desheila</creator><subject>T55.3.E96 Explosion prevention and protection</subject><description>KESELAMATAN KESEHATAN KERJA DAN KESEHATAN LINGKUNGAN (K3KL)&#xD; FAKULTAS KESEHATAN MASYARAKAT&#xD; UNIVERSITAS SRIWIJAYA&#xD; Skripsi, November 2019&#xD; Arief Berlianta Mukhtar&#xD; Kajian Pre-Fire Planning Pada Tangki Timbun T-04 Terminal BBM PT&#xD; Pertamina Marketing Operation Region II Kertapati Sumbagsel.&#xD; ii &#x2013; 108 halaman, 15 tabel, 9 lampiran&#xD; ABSTRAK&#xD; Risiko dan bahaya kebakaran memiliki efek domino yang mengakibatkan dari&#xD; kerusakan fasilitas sampai dengan menimbulkan korban jiwa. Kejadian kebakaran pada tangki penyimpanan yang terjadi di PT. Pertamina Cilacap pada tanggal 2 April 2011&#xD; lalu yang mengakibatkan kerugian finansial mencapai Rp. 270 miliar. Tujuan dari&#xD; penelitian ini adalah untuk Menganalisis Pre-Fire Planning pada Tangki Timbun T-04&#xD; di Terminal BBM di PT Pertamina Marketing Operation Region II Kertapati Sumbagsel. Penelitian ini menggunakan desain penelitian deskriptif kuantitatif yang bersifat observasional. Penelitian secara kuantitatif dilakukan untuk mengestimasi&#xD; besar kebakaran, menghitung kebutuhan pemenuhan air dan foam bagi upaya pemadaman dan pendinginan tangki lain disekitarnya. Hasil pada penelitian&#xD; menunjukkan bahwa kalkulasi penelitian yang menggunakan standar dari SPFE United&#xD; State Nuclear Regulatoy Commission, dan diketahui bahwa untuk ketiga skenario memiliki hasil HRR yang sama yaitu 2.182.84,62 kW. Total kebutuhan kapasitas air selama 65 menit penanggulangan kebakaran adalah 5.217.506,242 Liter. Total&#xD; kebutuhan foam untuk penanggulangan kejadian kebakaran apabila terjadi kebakaran pada tangki T-04 adalah 13.405,338 Liter. Dapat disimpulkan bahwa potensi bahaya kebakaran yang ada di area tangki timbun Terminal BBM disebabkan oleh listrik statis, overfilling, dan kelalaian manusia, serta dari pemodelan Fire Dynamic Simulator&#xD; didapatkan visualisasi selama 1 s dengan laju produksi kalor sebesar 1.4E05 kW,&#xD; adapun ketersediaan air telah mencukupi kebutuhan yang diperlukan yaitu sebesar 6.500 KL sedangkan ketersediaan foam belum memenuhi kebutuhan yang diperlukan sebesar 8.000 Liter. Perencanaan dalam antisipasi kejadian kebakaran perlu&#xD; diimplementasikan untuk meminimalisir dampak negatif yang berakibat fatal bagi perusahaan dan lingkungan sekitar.&#xD; Kata kunci : Pre-Fire Planning, Kebutuhan Air, Kebutuhan Foam, Heat Release Rate</description><date>2019-11-16</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/24810/1/RAMA_13201_10011281520246.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/24810/2/RAMA_13201_10011281520246_TURNITIN.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/24810/3/RAMA_13201_10011281520246_8856630017_01_front_ref.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/24810/4/RAMA_13201_10011281520246_8856630017_02.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/24810/5/RAMA_13201_10011281520246_8856630017_03.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/24810/6/RAMA_13201_10011281520246_8856630017_04.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/24810/7/RAMA_13201_10011281520246_8856630017_05.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/24810/8/RAMA_13201_10011281520246_8856630017_06.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/24810/9/RAMA_13201_10011281520246_8856630017_07.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/24810/10/RAMA_13201_10011281520246_8856630017_06_ref.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/24810/11/RAMA_13201_10011281520246_8856630017_07_lamp.pdf</identifier><identifier> MUKHTAR, ARIEF BERLIANTA and Andarini, Desheila (2019) KAJIAN PRE-FIRE PLANNING PADA TANGKI TIMBUN T-04 TERMINAL BBM PT PERTAMINA MARKETING OPERATION REGION II KERTAPATI SUMBAGSEL. Undergraduate thesis, Sriwijaya University. </identifier><recordID>24810</recordID></dc>
language ind
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author MUKHTAR, ARIEF BERLIANTA
Andarini, Desheila
title KAJIAN PRE-FIRE PLANNING PADA TANGKI TIMBUN T-04 TERMINAL BBM PT PERTAMINA MARKETING OPERATION REGION II KERTAPATI SUMBAGSEL
publishDate 2019
isbn 1001128152024
topic T55.3.E96 Explosion prevention and protection
url http://repository.unsri.ac.id/24810/1/RAMA_13201_10011281520246.pdf
http://repository.unsri.ac.id/24810/2/RAMA_13201_10011281520246_TURNITIN.pdf
http://repository.unsri.ac.id/24810/3/RAMA_13201_10011281520246_8856630017_01_front_ref.pdf
http://repository.unsri.ac.id/24810/4/RAMA_13201_10011281520246_8856630017_02.pdf
http://repository.unsri.ac.id/24810/5/RAMA_13201_10011281520246_8856630017_03.pdf
http://repository.unsri.ac.id/24810/6/RAMA_13201_10011281520246_8856630017_04.pdf
http://repository.unsri.ac.id/24810/7/RAMA_13201_10011281520246_8856630017_05.pdf
http://repository.unsri.ac.id/24810/8/RAMA_13201_10011281520246_8856630017_06.pdf
http://repository.unsri.ac.id/24810/9/RAMA_13201_10011281520246_8856630017_07.pdf
http://repository.unsri.ac.id/24810/10/RAMA_13201_10011281520246_8856630017_06_ref.pdf
http://repository.unsri.ac.id/24810/11/RAMA_13201_10011281520246_8856630017_07_lamp.pdf
http://repository.unsri.ac.id/24810/
contents KESELAMATAN KESEHATAN KERJA DAN KESEHATAN LINGKUNGAN (K3KL) FAKULTAS KESEHATAN MASYARAKAT UNIVERSITAS SRIWIJAYA Skripsi, November 2019 Arief Berlianta Mukhtar Kajian Pre-Fire Planning Pada Tangki Timbun T-04 Terminal BBM PT Pertamina Marketing Operation Region II Kertapati Sumbagsel. ii – 108 halaman, 15 tabel, 9 lampiran ABSTRAK Risiko dan bahaya kebakaran memiliki efek domino yang mengakibatkan dari kerusakan fasilitas sampai dengan menimbulkan korban jiwa. Kejadian kebakaran pada tangki penyimpanan yang terjadi di PT. Pertamina Cilacap pada tanggal 2 April 2011 lalu yang mengakibatkan kerugian finansial mencapai Rp. 270 miliar. Tujuan dari penelitian ini adalah untuk Menganalisis Pre-Fire Planning pada Tangki Timbun T-04 di Terminal BBM di PT Pertamina Marketing Operation Region II Kertapati Sumbagsel. Penelitian ini menggunakan desain penelitian deskriptif kuantitatif yang bersifat observasional. Penelitian secara kuantitatif dilakukan untuk mengestimasi besar kebakaran, menghitung kebutuhan pemenuhan air dan foam bagi upaya pemadaman dan pendinginan tangki lain disekitarnya. Hasil pada penelitian menunjukkan bahwa kalkulasi penelitian yang menggunakan standar dari SPFE United State Nuclear Regulatoy Commission, dan diketahui bahwa untuk ketiga skenario memiliki hasil HRR yang sama yaitu 2.182.84,62 kW. Total kebutuhan kapasitas air selama 65 menit penanggulangan kebakaran adalah 5.217.506,242 Liter. Total kebutuhan foam untuk penanggulangan kejadian kebakaran apabila terjadi kebakaran pada tangki T-04 adalah 13.405,338 Liter. Dapat disimpulkan bahwa potensi bahaya kebakaran yang ada di area tangki timbun Terminal BBM disebabkan oleh listrik statis, overfilling, dan kelalaian manusia, serta dari pemodelan Fire Dynamic Simulator didapatkan visualisasi selama 1 s dengan laju produksi kalor sebesar 1.4E05 kW, adapun ketersediaan air telah mencukupi kebutuhan yang diperlukan yaitu sebesar 6.500 KL sedangkan ketersediaan foam belum memenuhi kebutuhan yang diperlukan sebesar 8.000 Liter. Perencanaan dalam antisipasi kejadian kebakaran perlu diimplementasikan untuk meminimalisir dampak negatif yang berakibat fatal bagi perusahaan dan lingkungan sekitar. Kata kunci : Pre-Fire Planning, Kebutuhan Air, Kebutuhan Foam, Heat Release Rate
id IOS8119.24810
institution Universitas Sriwijaya
institution_id 177
institution_type library:university
library
library UPT Perpustakaan Universitas Sriwijaya
library_id 1098
collection Sriwijaya University Institutional Repository
repository_id 8119
city OGAN ILIR
province SUMATERA SELATAN
shared_to_ipusnas_str 1
repoId IOS8119
first_indexed 2020-03-23T08:01:34Z
last_indexed 2020-03-23T08:01:34Z
recordtype dc
_version_ 1686602870585032704
score 17.610285