Kajian Penundaan Produksi Minyak Bumi Akibat Penerapan Sistem Kontrak Terintegrasi = Oil production delay originated from the application of integrated contract

Main Authors: M.A. Andromedae, author, Add author: Lubis, Andi Fahmi, supervisor, Add author: Ayudha D. Prayoga, examiner, Add author: Manurung, Mandala, examiner
Format: Masters Bachelors
Terbitan: Universitas Indonesia , 2011
Subjects:
Online Access: https://lib.ui.ac.id/detail?id=20302792

Internet

https://lib.ui.ac.id/detail?id=20302792

Lokasi

Koleksi Repository Skripsi (Membership) Universitas Indonesia
Gedung Perpustakaan Universitas Indonesia
Institusi Universitas Indonesia
Kota KOTA DEPOK
Provinsi JAWA BARAT
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.