Kajian Penundaan Produksi Minyak Bumi Akibat Penerapan Sistem Kontrak Terintegrasi = Oil production delay originated from the application of integrated contract

Main Authors: M.A. Andromedae, author, Add author: Lubis, Andi Fahmi, supervisor, Add author: Ayudha D. Prayoga, examiner, Add author: Manurung, Mandala, examiner
Format: Masters Bachelors
Terbitan: Universitas Indonesia , 2011
Subjects:
Online Access: https://lib.ui.ac.id/detail?id=20302792
ctrlnum 20302792
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><type>Thesis:Masters</type><title>Kajian Penundaan Produksi Minyak Bumi Akibat Penerapan Sistem Kontrak Terintegrasi = Oil production delay originated from the application of integrated contract</title><creator>M.A. Andromedae, author</creator><creator>Add author: Lubis, Andi Fahmi, supervisor</creator><creator>Add author: Ayudha D. Prayoga, examiner</creator><creator>Add author: Manurung, Mandala, examiner</creator><publisher>Universitas Indonesia</publisher><date>2011</date><subject>Oil Production</subject><description>Kontrak terintegrasi untuk pengadaan barang dan jasa pada mulanya diharapkan dapat mempersingkat proses pengadaan barang &amp; jasa sehingga kegiatan kerja ulang dapat lebih cepat dieksekusi di lapangan, ternyata dalam beberapa kasus tidak dapat berjalan sebagaimana mestinya. Hal ini membuat K3S sebagai pengguna jasa mengalami penundaan realisasi produksi minyak bumi. Penelitian ini bertujuan untuk menganalisis kelebihan dan kekurangan antara penerapan kontrak terintegrasi dan kontrak tidak terintegrasi, faktor yang menyebabkan terjadinya keterlambatan vendor dalam memasok barang / jasa yang dibutuhkan pada kegiatan kerja ulang sumur, penundaan realisasi produksi minyak bumi terhadap penerimaan negara, dan memberikan rekomendasi bentuk kontrak pengadaan barang / jasa untuk kegiatan kerja ulang sumur. &lt;hr&gt; Integrated contract of goods and service fulfillment for Work Over activity of oil well which is initially expected to shorten the process of fulfillment in order to put execution faster on site, in some cases gave the opposite result that is delay in the oil production delay which was experienced by K3S as a user of this contract. This thesis aims to analyze the advantage(s) and disadvantage(s) of the application integrated contract compared to non integrated contract, the root cause which generated the delay of good / services to be delivered for work over activity on time, the impact which is generated from the delay of oil production to host country, and to propose recommendation regarding form of work over good /services contract.</description><identifier>https://lib.ui.ac.id/detail?id=20302792</identifier><recordID>20302792</recordID></dc>
format Thesis:Masters
Thesis
Thesis:Bachelors
author M.A. Andromedae, author
Add author: Lubis, Andi Fahmi, supervisor
Add author: Ayudha D. Prayoga, examiner
Add author: Manurung, Mandala, examiner
title Kajian Penundaan Produksi Minyak Bumi Akibat Penerapan Sistem Kontrak Terintegrasi = Oil production delay originated from the application of integrated contract
publisher Universitas Indonesia
publishDate 2011
topic Oil Production
url https://lib.ui.ac.id/detail?id=20302792
contents Kontrak terintegrasi untuk pengadaan barang dan jasa pada mulanya diharapkan dapat mempersingkat proses pengadaan barang & jasa sehingga kegiatan kerja ulang dapat lebih cepat dieksekusi di lapangan, ternyata dalam beberapa kasus tidak dapat berjalan sebagaimana mestinya. Hal ini membuat K3S sebagai pengguna jasa mengalami penundaan realisasi produksi minyak bumi. Penelitian ini bertujuan untuk menganalisis kelebihan dan kekurangan antara penerapan kontrak terintegrasi dan kontrak tidak terintegrasi, faktor yang menyebabkan terjadinya keterlambatan vendor dalam memasok barang / jasa yang dibutuhkan pada kegiatan kerja ulang sumur, penundaan realisasi produksi minyak bumi terhadap penerimaan negara, dan memberikan rekomendasi bentuk kontrak pengadaan barang / jasa untuk kegiatan kerja ulang sumur. <hr> Integrated contract of goods and service fulfillment for Work Over activity of oil well which is initially expected to shorten the process of fulfillment in order to put execution faster on site, in some cases gave the opposite result that is delay in the oil production delay which was experienced by K3S as a user of this contract. This thesis aims to analyze the advantage(s) and disadvantage(s) of the application integrated contract compared to non integrated contract, the root cause which generated the delay of good / services to be delivered for work over activity on time, the impact which is generated from the delay of oil production to host country, and to propose recommendation regarding form of work over good /services contract.
id IOS18065.20302792
institution Universitas Indonesia
institution_id 51
institution_type library:university
library
library Perpustakaan Universitas Indonesia
library_id 492
collection Repository Skripsi (Membership) Universitas Indonesia
repository_id 18065
city KOTA DEPOK
province JAWA BARAT
repoId IOS18065
first_indexed 2022-12-14T03:00:26Z
last_indexed 2022-12-14T03:00:26Z
recordtype dc
merged_child_boolean 1
_version_ 1752197090085175296
score 17.610468