Analisis Penjadwalan Kegiatan Pengerukan pada Proyek Pembangunan Pelabuhan Bias Munjul
Main Authors: | Akbar, Ridho, Dhanistha, Wimala Lalitya |
---|---|
Format: | Article info application/pdf Journal |
Bahasa: | ind |
Terbitan: |
Universitas Muhammadiyah Surabaya Publishing
, 2023
|
Subjects: | |
Online Access: |
https://journal.um-surabaya.ac.id/MINE-TECH/article/view/17088 https://journal.um-surabaya.ac.id/MINE-TECH/article/view/17088/5924 |
ctrlnum |
article-17088 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><title lang="id-ID">Analisis Penjadwalan Kegiatan Pengerukan pada Proyek Pembangunan Pelabuhan Bias Munjul</title><creator>Akbar, Ridho</creator><creator>Dhanistha, Wimala Lalitya</creator><subject lang="id-ID">Buffer Critical Path Method (CPM)</subject><subject lang="id-ID">Critical Chain Project Management (CCPM)</subject><subject lang="id-ID">Root Square Error Method (RSEM)</subject><subject lang="id-ID">Penjadwalan pelabuhan</subject><subject lang="id-ID">Project management</subject><description lang="id-ID">Pengerukan jalur pelayaran masih menjadi permasalahan dalam pembangunan di Pelabuhan Bias Munjul. kontraktor utama mengakhiri kerja sama dengan subkontraktor A pada bulan Oktober dan digantikan oleh Subkontraktor B menggunakan kapal cutter suction dredger (CSD) Y pada bulan November. Kerjasama dihentikan karena keterlambatan akibat seringnya terjadi kerusakan kapal CSD X milik subkontraktor A, sehingga hanya berhasil mengeruk sampai stationing (STA) 625 dengan durasi melebihi rencana awal. Pengerukan oleh subkontraktor B menggunakan kapal CSD Y dimulai dari STA 625 hingga STA 0, dan juga pada area kapal cepat. Karena penggantian kapal keruk, penjadwalan waktu kapal CSD Y perlu direncanakan, selaras dengan rencana awal dan untuk meminimalkan keterlambatan yang dapat mempengaruhi jadwal seluruh proyek pembangunan Pelabuhan Bias Munjul. Critical Path Method (CPM) cukup sering digunakan oleh berbagai proyek konstruksi, metode CPM akan dibandingkan dengan metode Critical Chain Project Management (CCPM) yang merupakan metode pengembangan dari CPM. Namun metode CCPM akan menghapus waktu keselamatan dari keseluruhan durasi waktu kerja dan dikendalikan oleh manajemen buffer. Pada penelitian ini dilakukan perbandingan perencanaan jaringan dan durasi kerja. Waktu buffer dihitung dengan menggunakan Root Square Error Method (RSEM). Selama analisis penjadwalan, perhitungan dilakukan secara manual dan menggunakan Microsoft Project. CPM dapat diselesaikan dalam 239 hari. Sedangkan metode CCPM dapat diselesaikan dalam waktu 231 hari, dengan tambahan waktu buffer 12 hari. Metode CCPM menghasilkan durasi jadwal yang berlangsung 8 hari lebih cepat dari metode CPM.</description><publisher lang="id-ID">Universitas Muhammadiyah Surabaya Publishing</publisher><date>2023-01-08</date><type>Journal:Article</type><type>Other:info:eu-repo/semantics/publishedVersion</type><type>Journal:Article</type><type>File:application/pdf</type><identifier>https://journal.um-surabaya.ac.id/MINE-TECH/article/view/17088</identifier><identifier>10.30651/mine-tech.v1i2.17088</identifier><source lang="id-ID">MINE-TECH: Journal of Manufacturing in Industrial Engineering & Technology; Vol 1 No 2 (2022): Journal of Manufacturing in Industrial Engineering & Technology; 38 - 50</source><source>2985-3516</source><source>10.30651/mine-tech.v1i2</source><language>ind</language><relation>https://journal.um-surabaya.ac.id/MINE-TECH/article/view/17088/5924</relation><rights lang="id-ID">Hak Cipta (c) 2023 Ridho Akbar, Wimala Lalitya Dhanistha</rights><rights lang="id-ID">https://creativecommons.org/licenses/by/4.0</rights><recordID>article-17088</recordID></dc>
|
language |
ind |
format |
Journal:Article Journal Other:info:eu-repo/semantics/publishedVersion Other File:application/pdf File Journal:Journal |
author |
Akbar, Ridho Dhanistha, Wimala Lalitya |
title |
Analisis Penjadwalan Kegiatan Pengerukan pada Proyek Pembangunan Pelabuhan Bias Munjul |
publisher |
Universitas Muhammadiyah Surabaya Publishing |
publishDate |
2023 |
topic |
Buffer Critical Path Method (CPM) Critical Chain Project Management (CCPM) Root Square Error Method (RSEM) Penjadwalan pelabuhan Project management |
url |
https://journal.um-surabaya.ac.id/MINE-TECH/article/view/17088 https://journal.um-surabaya.ac.id/MINE-TECH/article/view/17088/5924 |
contents |
Pengerukan jalur pelayaran masih menjadi permasalahan dalam pembangunan di Pelabuhan Bias Munjul. kontraktor utama mengakhiri kerja sama dengan subkontraktor A pada bulan Oktober dan digantikan oleh Subkontraktor B menggunakan kapal cutter suction dredger (CSD) Y pada bulan November. Kerjasama dihentikan karena keterlambatan akibat seringnya terjadi kerusakan kapal CSD X milik subkontraktor A, sehingga hanya berhasil mengeruk sampai stationing (STA) 625 dengan durasi melebihi rencana awal. Pengerukan oleh subkontraktor B menggunakan kapal CSD Y dimulai dari STA 625 hingga STA 0, dan juga pada area kapal cepat. Karena penggantian kapal keruk, penjadwalan waktu kapal CSD Y perlu direncanakan, selaras dengan rencana awal dan untuk meminimalkan keterlambatan yang dapat mempengaruhi jadwal seluruh proyek pembangunan Pelabuhan Bias Munjul. Critical Path Method (CPM) cukup sering digunakan oleh berbagai proyek konstruksi, metode CPM akan dibandingkan dengan metode Critical Chain Project Management (CCPM) yang merupakan metode pengembangan dari CPM. Namun metode CCPM akan menghapus waktu keselamatan dari keseluruhan durasi waktu kerja dan dikendalikan oleh manajemen buffer. Pada penelitian ini dilakukan perbandingan perencanaan jaringan dan durasi kerja. Waktu buffer dihitung dengan menggunakan Root Square Error Method (RSEM). Selama analisis penjadwalan, perhitungan dilakukan secara manual dan menggunakan Microsoft Project. CPM dapat diselesaikan dalam 239 hari. Sedangkan metode CCPM dapat diselesaikan dalam waktu 231 hari, dengan tambahan waktu buffer 12 hari. Metode CCPM menghasilkan durasi jadwal yang berlangsung 8 hari lebih cepat dari metode CPM. |
id |
IOS20313.article-17088 |
institution |
Universitas Muhammadiyah Surabaya |
institution_id |
761 |
institution_type |
library:university library |
library |
Perpustakaan Universitas Muhammadiyah Surabaya |
library_id |
880 |
collection |
MINE-TECH: Journal of Manufacturing in Industrial Engineering & Technology |
repository_id |
20313 |
subject_area |
Supply Chain & Logistic, Operations Research, Planning & Scheduling, Quality & Reliability, Industrial Food, Halal Industry Enterprise Engineering, Project Management, Energy & Environmental, Occupational Hafety and Health, System & Digital Manufacturing Decision Analysis, Computational Intelligence, Data Mining Healthcare, Medic System |
city |
KOTA SURABAYA |
province |
JAWA TIMUR |
repoId |
IOS20313 |
first_indexed |
2024-06-14T06:20:54Z |
last_indexed |
2024-06-14T06:20:54Z |
recordtype |
dc |
_version_ |
1801816537810599936 |
score |
9.9049015 |